Loading...
Duke Lesley 1A-LR080326 (2) Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311915 Project No.: 0713408 Date of Service: 01/29/2008 Report Date: 03/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 1 1 02/05/2008 7 6.00 28.27 160,400 5,670 1 2 02/26/2008 28 6.00 28.27 199,040 7,040 1 3 02/26/2008 28 6.00 28.27 196,950 6,970 Average 7,000 1 4 03/25/2008 56 6.00 28.27 206,610 7,310 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 0r3 ~Q] 5J] 5J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Mix Design I.D.: 7753 Placement Date: 01/29/2008 Weather Conditions: Clear Time Sampled: 03:20am Temperature - Air: Truck No: 120 Air Content: 5.6% Overall Placement Location: (Paving) Driveway parking spaces west side of building Measured Slump (inches) 5.0 Batch time: 02:59am Concrete: Ticket No: 10263 Unit Weight (pet): NA Sample Location: 40' south, 40' west from grid line L 1 Fracture Type Type2 Type2 Type2 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 311915 Project No.: 0713408 Date ot Service: 01/29/2008 Report Date: 03/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7753 Placement Date: 01/29/2008 Weather Conditions: Clear Time Sampled: 04:15am Temperature - Air: Truck No: 109 Air Content: 6.0% Overall Placement Location: (Paving) Driveway parking spaces west side of building Measured Slump . (inches) 6.0 Batch time: 03:45am Concrete: Ticket No: 10270 Unit Weight (pet): NA Sample Location: 40' west from grid line 1-1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 02/05/2008 7 6.00 28.27 99,700 3,530 Type3 2 2 02/26/2008 28 6.00 28.27 127,280 4,500 Type5 2 3 02/26/2008 28 6.00 28.27 123,920 4,380 Type5 Average 4,440 2 4 03/25/2008 56 6.00 28.27 148,550 5,250 Type6 ~~ ~~ 51] E;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 2 of 8 Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311915 Project No.: 0713408 Date of Service: 01/29/2008 Report Date: 03/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 3 1 02/05/2008 7 6.00 28.27 99,460 3,520 3 2 02/26/2008 28 6.01 28.37 154,680 5,450 3 3 02/26/2008 28 6.00 28.27 149,330 5,280 Average 5,370 3 4 03/25/2008 56 6.00 28.27 171,750 6,070 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~Ej ~~ 5IE t] DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Mix Design I.D.: 7753 Placement Date: 01/29/2008 Weather Conditions: Clear Time Sampled: 06:30am Temperature - Air: 660F Truck No: 109 Air Content: 5.0% Overall Placement Location: (Paving) Driveway parking spaces west side of building Measured Slump (inches) 5.75 Batch time: 06:06am Concrete: 530F Ticket No: 10283 Unit Weight (pet): NA Sample Location: 30' west from grid line F.1 Fracture Type Type6 Type2 Type5 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 3 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 311915 Project No.: 0713408 Date of Service: 01/29/2008 Report Date: 03/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 4 1 02/05/2008 7 6.00 28.27 104,430 3,690 4 2 02/26/2008 28 6.00 28.27 160,610 5,680 4 3 02/26/2008 28 6.00 28.27 163,660 5,790 Average 5,730 4 4 03/25/2008 56 6.00 28.27 169,340 5,990 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~EJ ~Q;J fJ] E;] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Mix Design I.D.: 7753 Placement Date: 01/29/2008 Weather Conditions: Clear Time Sampled: 07:57am Temperature - Air: 660F Truck No: 109 Air Content: 4.7% Overall Placement Location: (Paving) Driveway parking spaces west side of building Measured Slump (inches) 5.0 Batch time: 07:37am Concrete: 550F Ticket No: 10297 Unit Weight (pet): NA Sample Location: 35' west from grid line B.1 Fracture Type Type3 Type6 Type2 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 4 of 8 Rone Engineering Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 500, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 311915 Project No.: 0713408 Date of Service: 01/29/2008 Report Date: 03/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 5 1 02/05/2008 7 5.99 28.18 120,730 4,280 5 2 02/26/2008 28 6.00 28.27 168,440 5,960 5 3 02/26/2008 28 6.00 28.27 157,860 5,580 Average 5,770 5 4 03/25/2008 56 6.00 28.27 173,160 6,120 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 8]~ ~[g 5l] [SJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/29/2008 Weather Conditions: Mostly cloudy, windy Time Sampled: 09:45am Batch time: 09:47am Temperature - Air: 670F Concrete: 620F Truck No: 140 Ticket No: 10309 Air Content: 5.5% Unit Weight (pcf): NA Overall Placement Location: (Paving) Driveway parking spaces west side of building Measured Slump (inches) 4.75 Sample Location: 50' west from grid line A.1 Fracture Type Type3 Type5 Type5 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 5 of 8 Rone Engineering .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311915 Project No.: 0713408 Date of Service: 01/29/2008 Report Date: 03/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/29/2008 Weather Conditions: Sunny, windy Time Sampled: 12:30pm Batch time: 11:51am Temperature - Air: 680F Concrete: 650F Truck No: 109 Ticket No: 18896 Air Content: 5.6% Unit Weight (pct): NA Overall Placement Location: (Paving) Driveway parking spaces west side of building Measured Slump (inches) 5.75 Sample Location: 120' north, 120' west from center of approach at A.1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 6 1 02/05/2008 7 6.00 28.27 105,930 3,750 Type6 6 2 02/26/2008 28 6.00 28.27 163,550 5,780 Type6 6 3 02/26/2008 28 6.00 28.27 153,930 5,440 Type5 Average 5,610 6 4 03/25/2008 56 6.00 28.27 173,380 6,130 Type5 [gEJ ~~ ~ t] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 6 of 8