Loading...
ST9905-CS080416T H E • C I T Y • O F COPPELL Cl April 16, 2008 Mark R. Zortman, P.E. ECS- Texas, LLP 4950 Keller Springs Road, Suite 480 Addison, TX 75001 RE: Bethel Road I ST 99 -05 Construction Materials Testing Dear Mr. Zortman: This letter is to inform you that we will not be extending our contract with ECS on the referenced project. Any field work scheduled through Saturday April 19, 2008 will continue to be conducted by you personnel, and any laboratory analysis for samples taken prior to that date should be completed, and will be paid under our current contract. Thank you for your service during the course of this contract. Should you have any questions or need any additional information, please give me a call. Sincerely, Keith R. Marvin, P.E. Project Engineer 972 - 304 -3681 Fax: 972 - 304 -3570 E -mail: kmarvin @ci.coppell.tx.us CC: Rick O'Dell, Construction Inspector 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 9721462 0022 * FAX 972/304 3673 TRANSMISSION VERIFICATION REPORT TIME 04/16/2008 09:25 NAME FAX TEL SER.# BROF7J659084 DATE DIME 04/16 09:28 FAX N0. /NAME 99723920102 DURATION 00:00:20 PAGE(S) 01 RESULT OK MODE STANDARD ECM b80659fL3069 #'63S X31 Xd3 3WVN 6Z :60 800Z /9Z /b0 3WI1 W03 3QOW 710 QddQNd1S 1 -if1S3d Z0 (S)3Jdd 0Z :00 :00 NOI1ddf1Q ZOTOZGEZL66 3WVN /'ON XVJ 8Z :60 9Z /b0 3WI1`3iVG 1dOd3d NOI1d0IAId3A NOISSIWSNddl Page 1 of 1 Keith Marvin - Budget Letter ?;xv, -ex. ..+A:?. t�+...a.:,�,-•3 ,&•t.,ai ".... :�x�,e.'ax..�c,;a�.F ..c'; -::.: s � , -., fiat :. -.. .- Nrxu.;yx ,;y<,�:,g�:,,:�. __..a.,e�, � '" From: "MZortman" <MZortman(aecslimited.com> To: <kmarvin(aci.coppell.tx.us> Date: 4/10/2008 5:38 PM Subject: Budget Letter CC: "RLancaster" <RLancaster(aecslimited.com> Attachments: Budget Letter.pdf Good afternoon Keith, I have attached our budget summary letter for your review. If you should have any questions or comments, please do not hesitate to contact me. Thanks, Mark R. Zortman, P.E. President ECS- Texas, LLP 4950 Keller Springs Road Suite 480 Addison, Texas 75001 (972) 392 -3222 [Office] (972) 392 -0102 [Fax] (972) 872 -1382 [Cell] "Setting the Standard for Service" m zo rtm a n be cs I imited.com The ECS Group of Companies ENR #96 Top Design Firm This message, including any attachment hereto, is confidential and proprietary. If you are not the named recipient, you are kindly requested to notify the sender immediately and to delete this message, including any attachment, from your system. you are not allowed to copy, use or maintain this message, and the contents hereof must not be disclosed to any other person. file: //C: \Documents and Settings\kmarvin \Local Settings \Temp \XPgrpwise \47FE50BOCity... 4/16/2008 Mr. Keith Marvin, P.E. Project Engineer City of Coppell P.O. Box 9478 Coppell, Texas 75019 Geotechnical - Construction Materials - Environmental April 10, 2008 ECS Project No. 19:5061 Reference: Estimated Cost for Construction Materials Testing, Bethel Road, Remaining Work, Coppell, Texas Dear Mr. Marvin: Based on our recent meeting we are providing an estimated cost for construction materials testing services in order to complete the Bethel Road project. Based on our current estimated cost contract with the City of Coppell, we estimated 160 total trips for construction materials testing for a fee of $44,654.50. Through March 30, 2008 ECS has been to the site 163 times and $6,646.29 remains left in the budget, indicating that we are under budget for our initial assumed construction schedule. However, almost half of the road remains to be constructed. Therefore, we are providing an estimated total cost (attached) based on the following assumptions: • Box Culvert concrete placements will occur in 200 foot sections. Four trips for each 5 foot by 10 foot culvert are anticipated to sample concrete for the slab -on- grade, each wall (2) and top slab. • Pavement concrete placements will consist of an average of 500 cubic yard concrete placements. If you have any questions with regard to the information presented in this letter, or if we can be of further assistance to you, please do not hesitate to contact us at (972) 392 -3222. Respectfully, ECS - TEXAS, LLP os Lancaster Project Manager Attachments: As Stated Mark R. Zortman, P.E. Principal Engineer 4950 Keller Springs Road, Suite 480, Addison, TX 75001 - PH (972) 392 -3222 - FAX (972) 392 -0102 - www.ecs- texas.com Dallas - Austin Estimated Cost BETHEL ROAD FIELD SERVICES HOURS/DAYJ DAYSIWEEK WEEKS RATE I j_ TAL Box Culvert Technician 3 2 20 $34.00 $4,080.00 Pavement Technician 6 2 6 $34.00 $2,448.00 Soil Technician 6 2 6 $34.00 $2,448.00 $2,452.00 S/DAY DAYS/WEEK WEEKS RATE SUBTOTAL: $8,976.00 ,TORY TESTING Atterberg Limits Nuke Gauge Fee Cores for Thickness Trip Charge TESTING Box Culm Pavement V M 15 I MA-1'E I TOTAL � 2 $125.00 $250.00 2 $45.00 $90.00 12 $30.00 $360.00 10 $60.00 $600.00 64 $18.00 $1,152.00 SUBTOTAL: $2,452.00 S/DAY DAYS/WEEK WEEKS RATE TOTAL 6 2 20 $11.00 $2,640.00 30 2 6 $11.00 $3,960.00 SUBTOTAL: $6,600.00 Estimated Total Cost for Remaining Work: $20,732.20 Amount Remaining in Current Contract: $6,646.29 Additional Estimated Cost for Remaining Work: $14,085.91 The estimated cost has been prepared for your budgeting purposes based upon the assumed quantities and time frames detailed above. Actual costs may be greater or less than the estimate and will be calculated using the enclosed schedule of unit rates.