DR9101-CS 900510COPPELL PUBLIC WORKS MEMORANDUM DATE: May 10, 1990 TO: Alan Ratliff, FROM: Per Birdsall, RE: Oak Trail Drainage City Manager Street Superintendent~ / City Council Meeting Steve Goram requested me to respond to this tickler in his and Shohre's absence. I spoke with Frank and reviewed the existing documents about this project. From the information available to me, the total project will cost approximately $72,500. ~is is based on the Iow bid which was received and rejected by the City Council on Staff's recommendation. Included in the $72,500 (see attached breakdown) would be the study and findings of the probable cause of such a drainage problem, construction inspection and administration, and preparation of a drainage easement which was one of the items of cause for the recommendation for rejection by staff. Frank indicated that he would include this in the midyear budgeC process, but that the actual funding would have to come from the limited remaining surplus of CIP funds from which already two identified projects are vying (Loch Lane, Wrangler). This drainage problem is not on the Consultant's Priority list nor was it identified by the Drainage Subcommittee because it was already in progress. In conclusion, $40,000 was earmarked for the project but an additional $32,500 by current estimates will be needed to get the physical project underway. Upon reasonable expectations of funding being made available and direction, Public Works can proceed to contact the resident(s) to endeavor to obtain the easement(s) required and have DeShazo, Starek & Tang prepare the appropriate documents(s) for signature by the owner(s) of the affected area(s). PHB/bb xc: Frank Trando, Deputy City Manager/Finance Director Steve Goram, Director of Public Works Attachment Estimate (Bid) provided by SYB Construction Engineering Services invoiced beyond original scope Complete study, inspection, and administration by D S & Funds spent to date as indicated by Finance $60,477.00 $1,835.00 T $7,100.00 $2,642.00 $72,054.00 $72,500.00 Please note that this figure does not include any contingencies which would customarily be estimated as 10% of the entire project, which would be $7,250.00, nor have I seen any figure for the customary bonding~ This project will have to be re-bid due to the fact that action has previously been taken by Council.