Loading...
Duke Lesley 1A-LR080401 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312575 Project No.: 0713408 Date of Service: 02/04/2008 Report Date: 04/01/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 1 1 02/07/2008 3 6.00 28.27 121,120 4,280 1 2 03/03/2008 28 6.00 28.27 157,400 5,570 1 3 03/03/2008 28 6.00 28.27 156,400 5,530 Average 5,550 1 4 03/31/2008 56 6.00 28.27 171,140 6,050 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~~ ~~ ill] Q DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 02/04/2008 Weather Conditions: Cloudy, windy Time Sampled: 02:45am Batch time: Temperature - Air: 660F Concrete: 670F Truck No: 126 Ticket No: Air Content: 6.0% Unit Weight (pcf): NA Overall Placement Location: (Paving) Parking spaces on southeast comer of Building VI Measured Slump (inches) 5.0 Sample Location: 40' south from grid line U42 Fracture Type Type 5 Type2 Type6 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312575 Project No.: 0713408 Date of Service: 02/04/2008 Report Date: 04/01/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 2 1 02/11/2008 7 6.00 28.27 102,100 3,610 2 2 03/03/2008 28 6.00 28.27 139,800 4,940 2 3 03/03/2008 28 6.00 28.27 138,720 4,910 Average 4,930 2 4 03/31/2008 56 6.00 28.27 148,450 5,250 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~E3 ~[g 5IE [s] DO D Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 02/04/2008 Weather Conditions: Cloudy, windy Time Sampled: 04:30am Batch time: Temperature - Air: 670F Concrete: 680F Truck No: 115 Ticket No: Air Content: 5.7% Unit Weight (pet): NA Overall Placement Location: (Paving) Parking spaces on southeast comer of Building VI Measured Slump (inches) 5.75 Sample Location: 35' south from grid line U41 Fracture Type TypeS Type5 Type2 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 2 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312575 Project No.: 0713408 Date of Service: 02/04/2008 Report Date: 04/01/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 3 1 02/11/2008 7 6.00 28.27 171,040 6,050 3 2 03/03/2008 28 6.00 28.27 216,610 7,660 3 3 03/03/2008 28 6.00 28.27 215,700 7,630 Average 7,640 3 4 03/31/2008 56 6.00 28.27 240,820 8,520 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 [?J~ ~[g rnJ t] DO D Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 02/04/2008 Weather Conditions: Cloudy, windy Time Sampled: 07:00am Batch time: Temperature - Air: 680F Concrete: 700F Truck No: 139 Ticket No: Air Content: 4.0% Unit Weight (pct): NA Overall Placement Location: (Paving) Parking spaces on southeast corner of Building VI Measured Slump (inches) 5.5 Sample Location: 40' south from grid line U39 Fracture Type Type2 Type5 Type6 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 3 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312575 Project No.: 0713408 Date of Service: 02/04/2008 Report Date: 04/01/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 4 1 02/11/2008 7 6.00 28.27 163,890 5,800 4 2 03/03/2008 28 6.00 28.27 216,330 7,650 4 3 03/03/2008 28 6.00 28.27 219,040 7,750 Average 7,700 4 4 03/31/2008 56 6.00 28.27 233,090 8,240 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~~ ~g] fiIE [s] DO D Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design 1.0.: 7753 Placement Date: 02/04/2008 Weather Conditions: Cloudy, windy Time Sampled: 08:30am Batch time: Temperature - Air: 690F Concrete: 720F Truck No: 126 Ticket No: Air Content: 5.0% Unit Weight (pet): NA Overall Placement Location: (Paving) Parking spaces on southeast corner of Building VI Measured Slump (inches) 5.0 Sample Location: 30' north from Al6.7 Fracture Type Type2 Type6 TypeS Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 4 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312575 Project No.: 0713408 Date of Service: 02/04/2008 Report Date: 04/01/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 Placement Date: 02/04/2008 Weather Conditions: Partly cloudy, windy Time Sampled: 12:35pm Batch time: Temperature - Air: 770F Concrete: 770F Truck No: 135 Ticket No: Air Content: 5.7% Unit Weight (pet): NA Overall Placement Location: (Paving) Parking spaces on southeast corner of Building VI Measured Slump (inches) 5.0 Sample Location: 77' south from grid line U5.2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 02/11/2008 7 6.01 28.37 148,890 5,250 Type2 5 2 03/03/2008 28 6.00 28.27 197,110 6,970 Type6 5 3 03/03/2008 28 6.00 28.27 200,580 7,090 Type5 Average 7,030 5 4 03/31/2008 56 6.00 28.27 224,030 7,920 Type2 l2JE3 ~[g 5J] Ej DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KWfKW) Page 6 of 8