Loading...
Oroza-CS080422 THE.CITY.OF COPPELL '~~*IJ: . ....~/-c April 22, 2008 Jeffrey Wooten, P.E. Wooten Engineering 623 E. Dallas Rd. Grapevine, Texas 76051 RE: Oroza Office Addition, Lots 1 & 2 Block A Construction Plan Review Comments The City of Coppell has reviewed the referenced plans and has the following comments to offer: Plat - I. Include the plat with the plans to be submitted. Site Plan - 2. Include the site plan with the plans to be submitted. Pavine Plan - 3. Refer to the City of Coppell Standard Construction Details. 4. Verify whether the Landscape plan and Tree survey sheet L-I will also serve as the paving plan. Sheet L-I is labeled Landscape and Paving Plan on the cover sheet. We will need details on the Grass Crete paving along with the parking lot paving. Water and Sanitarv Sewer Plan - 5. The Contractor will need to submit a traffic control plan 72 hours prior to working in Coppell Rd. It may be necessary to coordinate the construction with the S. Coppell Rd. project. 6. Will you need an irrigation meter? Gradine Plan- 7. When you came in to visit with us you mentioned that you would work on the grading plan for an alternative to the storm drain. Were you able to revise? If so, please submit for review. The City of Coppell has reviewed the revised plans for the referenced addition and they have been approved with the comments above addressed to meet our requirements. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, ~ Michael Garza, E.!. T Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 E-mail mgarza@ci.coppell.tx.us