SS9301-AG 930713
i \.~,f
l^ ~ .
VU.
-
AGENDA REQUEST FORM
CITY COUNCIL MEETING July 13. 1993
ITEM NUMBER
J '7
ITEM CAPfION:
Consideration and approval or Change Order #3 to the Grapevine Creek Sewer Trunk Main Branches I and II in
the amount or $101,308.00 and authorizing the Mayor to sign.
SUBMITTED BY:
.
sr~~~~:w~
OTHER REP.:
DATE:
EVALUATION OF ITEM:
CITY
DATE
APPROVED
RY
u'
CfU~CIL
'1 I,j q '$
I
See attached memo.
BUDGET AMT. vJ+
I
AMT. + 1- BUDGET
AMT. ESTIMATED L
FINANCIAL REVIEW BY iJ1a..-..
f
COMMENTS:
Wat<< & Sewer Rev.,... ...... Seri. 1991
Wat<< & Sewer ReveIlIIe..... Series 1992
$2,490,000
1.500..
$3,990,000
3.247..
$742.'"
Paid & Encumbered at of "'30-93
.Available as of 6-30-93
Funds can come from this avail.... W-
REVIEWED BY CM.dAl:;J~ .
LEGAL REVIEW BY:
AGENDA REQUEST FORM REVISED 2/93
MEMORANDUM
To:
Mayor and City Council
Kenneth M. Griffin, P.E., City Engineer ~
From:
RE:
Consideration and approval of Change Order #3 to the Grapevine Creek
Sewer Trunk Main Branches I and n in the amount of $101,308.00 and
authorizing the Mayor to sign.
Date:
July 13, 1993
For some time now the City has been negotiating with Mr. Don Carter and Mr. Jay Riney for
the acquisition of temporary construction easements across their property. The total square
footage of the easement the City has been trying to obtain is 77,898 square feet. This easement
in essence extends from Moore Road westward to Grapevine Creek (see attached exhibit).
On June 6th, 1993, the contractor, my inspector, Mr. Jim King (representing Mr. Carter) and
myself walked the project to determine the extent of tree removal and potential damage to the
property. The first 1500 feet of Mr. Carter's property had various trees where the City would
have to remove limbs and in some cases entire trees, but in all cases it was sporadic on the
removal of the trees. To install the sewer line on the west 300 feet of Mr. Carter's property and
across Mr. Riney's property would necessitate the removal of ever tree within the easement.
Even with the removal of all the trees, it was still questionable whether or not the contractor
would have adequate space to stock pile materials and access the project. In essence, to open
cut to install the sewer line would necessitate the removal of approximately 30 to 35 trees and
would entirely change the view of the property. Immediately south of Mr. Riney's property, the
City had already bid the project to begin the micro-tunnelling process from the north side of
Grapevine Creek to the west side of Denton Tap Road. This includes micro-tunnelling the entire
stretch of Bethel Road in the Creekview Subdivision.
It is doubtful that Mr. Carter will be willing to negotiate with the City on the acquisition of the
easement if the City holds to its position of open cutting the last three hundred feet of Mr.
Carter's property and removing every tree in that area. However, after a meeting on July 7,
1993 with Mr. Carter, there is an indication by Mr. Carter that he will grant us a temporary
easement, grant us the ability to move the sewer line to avoid some of his other trees and then
grant us a new 20 foot easement over the top of the new sewer line and allow us to remove trees
and branches on the east side of the property as necessary to install the line if in return the City
will micro-tunnel the last 300 feet of his property and the 300 feet on the adjacent property
thereby saving all the trees in this area. The cost to micro-tunnel this project $101,308.00.
Currently, the section of the sewer line installation from MacArthur to Moore Road has basically
been completed. This is about 37% of the entire project. As of yet, the City has encountered
no unusual situations or circumstances which would necessitate a change in the scope of the
project. Council may recall that when this project was awarded I indicated that there was a
strong potential for various change orders throughout installation of this project due to the
complexity of the project and the unknowns encountered dealing with the construction of the
project.
The Engineering Department's recommendation is to approve Change Order # 3 in the amount
of $101,308.00 to micro-tunnel an additional 589 feet on this project. Staff will be available to
answer any questions.
--
CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT:
Grapevine Creek Sewer Trunk Project
Branches I and II
CONTRACTOR:
Kenko Inc. Contractors
OWNER:
City of Coppell
CHANGE ORDER NO.: 3
DATE: 7/13/93
CHANGE OR EXTRA WORK TO BE DONE
Delete 589 feet of 30" PVC Sewer Pipe (20-25)
589 feet @ $98.00 per foot
- $ 57,722.00
Add 589 feet of Micro-tunnel & pipe
589 feet of Micro-tunnel & pipe @ $270.00 per foot
f
I
Total cost of proposed changes I
$159,030.00
$101,308.00
Previous contract amount
Net increase in contract amount
Revised contract amount
Net increase in contract time of completion
Revised contract time of completion
$2,815,005.50
$ 101,308.00
$2,916,313.50
N/A
No Change
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full
accord and satisfaction of all past and future liability originating under any clause in the Contract
by reason of this revision to the Contract.
y the City Engineer:
,
Date:
7/ ' ~ /0... 3
Date:
'//9/1 :1
Date:
7); /$Z;>
/ '
-
CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT:
Grapevine Creek Sewer Trunk Project
Branches I and II
CONTRACTOR:
Kenko Inc. Contractors
OWNER:
City of Coppell
CHANGE ORDER NO.: 3
DATE: 7/13/93
CHANGE OR EXTRA WORK TO BE DONE
Delete 589 feet of 30" PVC Sewer Pipe (20-25)
589 feet @ $98.00 per foot
- $ 57,722.00
Add
589 feet of Micro-tunnel & pipe
589 feet of Micro-tunnel & pipe @ $270.00 per foot
$159,030.00
$101,308.00
Total cost of proposed changes
Previous contract amount
Net increase in contract amount
Revised contract amount
Net increase in contract time of completion
Revised contract time of completion
$2,815,005.50
$ 101,308.00
$2,916,313.50
N/A
No Change
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full
accord and satisfaction of all past and future liability originating under any clause in the Contract
by reason of this revision to the Contract.
Recommended by the City Engineer:
,
Date: 7/'~ I ~
Date: .7//~/7 J
Accepted by the Owner:
Date:
1a7d37/93 113:51
Z 12149315474
KENKO INC
P.la2
~!!!!f9=
July 7, ] 993
City ot Coppell
255 Parkway Boulevard
Coppall, TX 750]9
Attn: Hr. Ken Griffin, r.E.
Rc: Grapevine Creek SowAr Trunk Main - Branch J
Ci ty 01 Coppe] 1, 'J'X
Kenko Job #9306
* Additional mico-tunnel . Rta. 83+24 to Sta. 89+13
Dear Sirs:
Tn response to your request, the fOllowing are COSt5 involved
in changintg the sewer on the referenced project fro~ Station 83+24
to Station 89+13 to micro-tunnelling in lieu of open cut.
Add:
589 Li.near Foot
589 Linear ft~oot
Micro-tunnel 0
30" FBROLS Pipe 0
$] 5!1. 00/1 f
$.115.00/1f
S 91,295.00
_6:1,735.00
Subtota.l (Add)
$1!,9. 030.00
pelate:
589 Linear Foot 2610-4 30" PVC
(20'-25' Depth)
. $98.00
$ 57. 722~Q.Q.
Subtotal (De]ete)
$ 57,r/22.00
Not Chango
Add
$]01,308.00
If this
Change Order.
is approved, please forward the appropriate
Please call if YOU have any questions.
. ~ a1 erely.
(Ua/J/~~-.
llaniel R. F~~~p:;r--'
Kenko, Inc.
50U'n1~1':.~TERN DIVISIO~~. I 6415 ^t1dl~ml f{lI,., Ste. ~~.IU - Dallas~ :f~_.!J').?-48 . (2'.4) 9.} J -94~~~!!!.~ .(214)P31-S4 ?~.____
WEsn~KN UIVJSION - Post Orfit;C Box 8':' 1 - Calimesa, calilornla 9:l;520 . (7 J II) 795.2568 - Fa/( (714) 795.184.0
'--... ~'.- ... --- "-" . ...-.... - .. ... ...
COf{"'ORA'l~ OFFlCL - 1694 91sl AVCllut~ . blalne. Minnesota 55'1'19 - (612) 786-65 II) . Fax (612) 786-6602
J- \ '
t ' \
,~ \ "
'~ \
:; !~\
6~ ",,"
~ ; \ \~ \
.. L- ......
\" '--, -- \-\~~j.\
___________________._~~,I-----i \
'____--\ \
.. \
\ ..
.. \
~
,
,
I
,
I
I
_.~ - -----t
I
! ~
,.;
II!
\
l"")
'l1:
""
~
<5
<l)
Q()
r:::
l:l
6
""
~
Q()
r:::
;.:::
<l)
r:::
r:::
i!
e
~
~
'(:;>
.tz
.~
~
~
<l)
...
(;)
~
&;
,
\
,
\
"
\
-
.....;,
..;
00
0\
00
t-.. ~
t-..
'-
....
r:::
<l)
E:
<l)
~
te
(;)
0-/::1
~
S
...
te
8
t'
~
(;)
~
~
"Q>
.tz
:~
.::s
~
<l)
...
(;)
~
&;
----
~'J "'--0 ,
_.,-'~.j
8 !
~ ; S
C i
~ I
.'f/#
- H.LlION
~
acres, located at the southwest comer of Freeport Parkway and Bethel Road in the City
of Coppell.
Mayor Pro Tern Robertson moved to approve Ordinance No. 93607 designating Minyards
Foods, Inc. Tax Abatement Area as Reinvestment Zone No.1 (TAR-I); pursuant to Section
312.201 of the Property Redevelopment and Tax Abatement Act, said area being the property
owned by Minyards Foods, Inc., and described as Tract 1, Abstract 1439, consisting of 62.528
acres, located at the southwest comer of Freeport Parkway and Bethel Road in the City of
Coppell. Council member Reitman seconded the motion; the motion carried 6-0 with Mayor Pro
Tern Robertson and Council members Weaver, Stahly, Reitman, Mayo, and Garrison voting in
favor of the motion.
16.
A.
Reconsideration of action taken regarding an ordinance for Case #PD-129(R) to
change the zoning designation from (TC) to (PD-SF-9) on a parcel of land located
at the southwest comer of Parkway Boulevard and Denton Tap Road.
Mayor Pro Tern Robertson moved to reconsider the action taken regarding an ordinance for Case
#PD-129-(R) to change the zoning designation from (TC) to (PD-SF-9) on a parcel of land
located at the southwest comer of Parkway Boulevard and Denton Tap Road. Council member
Garrison seconded the motion; the motion carried 5-1 with Mayor Pro Tern Robertson and
Council members Stahly, Reitman, and Mayo voting in favor of the motion and Council member
Weaver voting against the motion. Council member Garrison abstained which is considered as
an affirmative vote per City of Coppell Home Rule Charter, ~3.11-B.
B. Discussion and consideration of approving an ordinance for Case #PD-129(R)
changing the zoning from (TC) to (PD-SF-9) on land located at the southwest
comer of Parkway Boulevard and Denton Tap Road and authorizing the Mayor
to sign.
Mayor Pro Tern Robertson moved to approve Ordinance No. 915oo-A-37 for Case #PD-129(R)
changing the zoning from (TC) to (PD-SF-9) on land located at the southwest comer of Parkway
Boulevard and Denton Tap Road and authorizing the Mayor to sign. Councilmember Mayo
seconded the motion; the motion carried 5-1 with Mayor Pro Tern Robertson and
Council members Stahly, and Mayo voting in favor of the motion and Council member Weaver
voting against the motion. Council members Reitman and Garrison abstained which is considered
as an affirmative vote per City of Coppell Home Rule Charter, ~3.11-B.
17. Consideration and approval of Change Order #3 to the Grapevine Creek Sewer Trunk
Main, Branches I and II in the amount of $101,308.00 and authorizing the Mayor to
sign.
Ken Griffin, City Engineer, made a presentation to the council. Mayor Pro Tern Robertson
moved to approve Change Order #3 to the Grapevine Creek Sewer Truck Main Branches I and
II in the amount of $101,308.00. Council member Mayo seconded the motion; the motion
carried 6-0 with Mayor Pro Tern Robertson and Council members Weaver, Stahly, Reitman,
Mayo, and Garrison voting in favor of the motion.
The Consent Agenda Items 22 Band J were considered at this time. See Item 22 for minutes.
EXECUTIVE SESSION
(Closed to the Public)
'1
.....
A.
Article 6252-17, Section 2(e), and Senate Concurrent Resolution Number 83,
discussion with City Attorney concerning matter involving privileged
communications between attorney and client.
CM071393