Loading...
Braewood North-CS080512 THE.CITY.OF corrELL " .( May 12, 2008 Peter Buell c.R. Buell Construction Company, Inc. 3308 Shorecrest Drive Dallas, TX 75235 RE: Braewood North (The Gables) Concrete Placement Dear Mr. Buell: During the inspection of the concrete paving placement I noticed that the appropriate measures to place concrete were not sufficient to meet the City of Coppell standards. The chairs were not used to raise the rebar throughout the process of the pour. I observed steel being left on the ground during the pour. The redwood expansion joints were not placed in the proper place and are not full depth as the construction standard details show and in some locations they are not redwoods. Due to the lack of manpower the concrete was setting up too fast so more water was added and as a result, the finished product is chalky and pitted. There are cracks and spots that pond water. I recommend removing the concrete as it is unacceptable to the City of Coppell. A copy of the construction standard details is required to be on the jobsite at all times. Your superintendant, Charles, has yet to obtain a copy of these standard details. This letter along with pictures taken of the concrete will be placed in our file as public information for potential buyers. If you have any questions you may contact me at your convenience. SiJJL~ Albert Samaniego Construction Inspector Office Phone: (972) 304-3679 Fax: (972) 304-3570 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673