Loading...
Rolling Oaks MC-CS080527 THE.CITY.OF COPPELL May 27, 2008 Michael Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane Suite 600 Dallas, TX 75231 RE: Rolling Oaks Memorial Center (Funeral Home) Construction Plan Review Comments The City of Coppell has reviewed the referenced plans and with the following comments addressed they will be approved. Utility Plan- 1. A 2" domestic meter will require a double check per standard detail 4150. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. If you have any questions, please contact me at your convenience. Sincerely, Michael Garza, E.I.T Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 E-mail mgarza@ci.coppell.tx.us 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673