Loading...
Duke Lesley 1A-CS080506 THE.CITY.OF corrELL .~~. eJ{ ~ ~q t\.s . 1 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING From: Ken Griffin, P .E., Dir. of Engineering / Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Fire Marshal Larry Davis, Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 To: Date: May 6, 2008 RE: W ALK- THRU INSPECTION Duke Lesley Addition, Lot 1 Block A, Point West VI A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for: Wednesday, May 7, 2008 at 9:00 a.m. Please let me know if I can be of further assistance. cc: Dick Serio, Duke Construction Carl Burnett, Potter Concrete Bob Beserra, San Saba Const. fax # 972-361-6800 fax # 972-438-3095 fax # 972-509-8088 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"