Duke Lesley 1A-CS080506
THE.CITY.OF
corrELL
.~~.
eJ{ ~ ~q
t\.s . 1
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
From:
Ken Griffin, P .E., Dir. of Engineering / Public Works
Glenn Hollowell, Asst. Dir. of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Fire Marshal
Larry Davis, Construction Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
To:
Date:
May 6, 2008
RE:
W ALK- THRU INSPECTION
Duke Lesley Addition, Lot 1 Block A, Point West VI
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for:
Wednesday, May 7, 2008 at 9:00 a.m.
Please let me know if I can be of further assistance.
cc:
Dick Serio, Duke Construction
Carl Burnett, Potter Concrete
Bob Beserra, San Saba Const.
fax # 972-361-6800
fax # 972-438-3095
fax # 972-509-8088
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"