Loading...
DR9002-CN 901023//'gev..4-24-89 AGENDA REQUEST FORM CIT~ COUNCIL I~ETING October 23~ 1990 ITEM CAPTION: Consideration of approval of final acceptance of the Hill Drive Drainage Improvement Pi~ct and SURWTTTED BY=v ~I (~[rectok's Signature) ~vAT,UATION OF ITEM: autl~rizing the final payment of $3,654.04. STAFF P~P.~ Larry Davis. Construction Inspection ~r~R REP.~ Rick Bennett, S.Y.B. Construction DATE~ October 15, 1990 Please find attached a copy of the final payment request submitted by S.¥.B. Construction Co. for completion of the Hill Street Drainage Project. Staff recommends final acceptance of this improvement. BUDGET ~P.: $~n.nnn nn COW~TS = A~. ESTI~ATED:~~W~. +/- BUDGET:-2793_43 FINANCIAL REvlEW BY:~ The ~uount budget for this project was $50,000.00 We have p~ia $43,552.53 to date with this final payment $3,654.04. The total cost of the project is $47,206.57. LEGAL REVIEWBY: AGENDA~QFORM 0588DS City of Coppell APPI, I. CATJ. ON FDR I'AYflENT FROH: S.Y.B. Construction Co., inc. - Contractor I'ROAECC TITLE: ttill Street Drainage PAYHENT REQUEST # 3rd & FINAL PERIOD ENUINC 8-31-90 3 6 8 #1 I)ESCR] PI'tON Saw Cut Pavement Remove Pavement 6" Conc. Pavement Single Grate Inlet Dbl. Grate Inlet 18" RCP 36 x 36 x 60 Wye Trench Safe. ty Change Order UNI'r OF HEASIIRE SY SY EA EA LF EA LS LS (]'l.'y 791.00 570.00 570. 00 1. O0 1.00 275. OO I. O0 1.00 I .00 'REV C,,()HP 1, TOTAL ~TY ,' TIIIS QTY ' UNIT VAI,UE 3OtlP], EST, COHPL PRICE OF WORK 91.O0 0.00 791.00 1.75 l, 384.~ 70.00 0.00 570.00 10,81. 6,161.. 70.00 0.00 570.00 24.42 t3,919.1 1.00 0.00 1.00 1000.00 1,000.( 1.O0 0.00 1.00 1450.00 ~, 4 .50.( 75.'00 O.00 275.00 29.00 7,975.( 0.75 0.25 1.OO IOO0.O0 1,000..( 1.00 0.00 1.00 400.00 400.( I .00 0.00 , l. O0 1000.00 1,000.( ORICINAI, CONTRACT AHOHNT: TOTAl, CII^NGE OR.I)F. II.S: TOTAL CONTRACT AHOUNT TO OATE: TO'rAL VAI,UE OF WORK TO UATE: TOTAL VALUE OF WORK PERFoRHED PREVIOUSLY: TOTAL TO DATE: 1~000.00 34,290.35 34,290.35 34,040.0~ 34,290.35 LESS AHOUNT OF RETAINAGE TOTAL LESS RETAINAGE: TOTAl, PREVIOUS APPI,ICATIONS: AHOlINT lille Till S RE(JI1E.~T: -0- 30,636.31 3,654.04 COPPELL PUBLIC WORKS October 17, 1990 Shohre Daneshmand, Civil Engineer Larry D~,~,~Development Construction Inspector Hill Drive Drainage On Monday, March 5, 1990 the City of Coppell accepted bids for localized drainage improvements for Hill Drive Alley drainage improvement. The improvements included removal and replacement of concrete alley pavement, placement of 18" RCP storm sewer and grate inlets. By City Council action on April 24, 1990 a contract was awarded to S.Y.B. Construction Company, P.O. Box 13614, Arlington, Tx with construction activity commencing on June 18, 1990. A final inspection of the project has been confirmed by representatives of the Public Works Department and accepted as complete and inplace per contract. S.Y.B. Construction Company has submitted the final payment request for City Council consideration and approval (see attached). If I can be of further assistance please let me know. CLD/mp HILLDRIV.CLD AGENDA REQUEST FORM CITY COUNCIL MESTING April 24, 1990 ITEM NO. ITEM CAPTION: Consideration of approving and awarding a bid for Hill Drive alley drainage improvements to SYB Construction Company, the lowest qualified bid received, for an amount not to exceed $33,290.35, and authorizing the Mayor to sign th~ contract ~ after it is contra~ and r~ie~ by staff. ~Dire.ctor S Signature) EVALUATION OF ITEM: At 10:00 a.m. accepted bids for localized fully executed by the STAFF REP..: Shohre Danesb~andr .Actinq City Engineer OTHER PEP ..: DATE: April 13, 1990 on Monday, March 5, 1990, the City of Coppell as advertised (see attached advertisement) drainage improvements for Hill Drive alley drainage improvement.. These improvements will include removal and replacement of concrete alley pavement, placement of 18' RCP storm sewer and grate inlets. Staff recommends approval. COMMENTS: AMT. ESTIMATED: ANT. +/- BUDC. ET: FINANCIAL ~IEW BY: /~'~ ---[~,.-- See attached memo LEGAL REVIEW BY: AGENDA REQ FORM 0588D$ I~W]~TED BY April 20, 1990 ~emorandum To: From: Subject: Alan D. Ratliff, City Manager Frank Trando, Deputy City Manager/Finance Director~4~°~/ Funds for Hill Drive Drainage Improvements we have set aside 850,000 out of interest surplus in the Street C.I.P fund for this project. The Council will need to include a $33,300 appropriation in their motion to take care of this contract. The funds are available at this time. FT/lr HILDRIVE.O01 _J r ~\ ~' MOCKIN~IAD SHT. NO. 2~ ! s I 4 I WOODRID6£ SECTICN TWO V~CINITY MAP Nt.S, HILL DRIVE Ol~ INA6F. IMI:~OVEMENT CITY COUNCIL MEETING October 23, 1990 ITeM NO.. ITEM CAPTION= Consideration of approval of final acceptance of the Hill Drive Drainage lorizing the final payment of $3,654.04. Signature ) STAFF REP.~ Larry Davis, · Construction Inspection ~£u~R REP.~ Rick Bennett. S.Y.B. Construction DATEs October 15. 1990 EVALUATION OF ITEM= Please find attached a copy of the final payment request submitted by ~ S.Y.B. Construction Co. for completion of the Hill Street Drainage .Project. Staff reconvn~ids final acceptanle of this.~vement. BUDGET AMT.= COMMENT~ AMT. ESTIMATED~ FINANCIAL REVIEW BY: A~T. +/- BUDGETs LEGAL REVIEWBy: AGENDA REQ FORM 0588DS REVIEWED BY_.~ s COPPELL PUBLIC WORKS DATE: TO: FROM: RE: October 17, 1990 Shohre Daneshmand, Civil Engineer Larry D~,~Development Construction Inspector Hill Drive Drainage On Monday, March 5, 1990 the City of Coppell accepted bids for localized drainage improvements for Hill Drive Alley drainage improvement. The improvements included removal and replacement of concrete alley pavement, placement of 18" RCP storm sewer and grate inlets. By City Council action on April 24, 1990 a contract was awarded to S.Y.B. Construction Company, P.O. Box 13614, Arlington, Tx with construction activity commencing on June 18, 1990. A final inspection of the project has been confirmed by representatives of the Public works Department and accepted as complete and inplace per contract. S.Y.B. Construction Company has submitted the final payment request for City Council consideration and approval (see attached). If I can be of further assistance please let me know. CLD/mp HILLDRIV.CLD I I -;i io / :~ ~ ~ ~i J :! ~1 WOODRIDGE SECTION TWO VICINITY MAP NT.S. HILL OKIVE ORAINAGF.. 11~4~ENIEIdT APPLiCATiON FOR PAYHENT TO: City of Coppell FROH: S.Y.B. Construction Co., Inc. - Contractor PRO.IECT TITLE: Hill Street Drainage rAYH~NT REQIIEST ~ j.r_dj__F_~_N_A.!!_PERiOU 8-3] -90 4 6 ? #1 I)ESCR]PTION Saw Cut Pavement Remove Pavement 6" Conc. Pavement Single Grate Inlet Dbl. Grate Inlet 18" RCP 36 x 36 x 60 Wye Trench Safety Change Order IINIT OF HEASHRE LF SY SY EA EA LF EA LS LS nil) {TrY 791.00 570.00 570.00 1.00 1.00 275.00 1.00 1.00 1.00 PREV QTYj" COHPI, 791.00 570.00 570.00 1.00 1.00 275.00 0.75 1.00 1.00 QTY Tills EST, 0.00 0.00 0.00 0.00 0.00 0.00 0.25 0.O0 0.00 TOTAL qTY' COMPL 791.00 570.00 570.00 1.00 1.00 275.00 1.00 1.00 1.00 UNIT VALUE PRICE OF WORK 1.75 1,384.Z!f 10.gl 24.42 [3.919.4( 1000.00 1,000.0( 1450.00 .},450.0( 29.00 7,975.0( 1000.00 1,000.0( 400.00 400.00 1000.00 1,000.00 ORICI. NAL CONTRACT AHOUNT~ 3'()'CAI, CIIANGE ()RI)ERS: TOTAL CONTRACT AHOUNT TO I)ATE~ TOTAL VALUE OF WORK TO DATE~ TOTAL VALUE OF WORK P~RFORMEI) PREVIOUSLY~ TOTAL TO I)ATE~ 33,290.35 1,OQO.O0 34,290.35 34,290.35 34,040.0~ 34,290.35 LESS AHOUNT OF RETAINAGE TOTAL LESS RETAINAGE: TOTAL PREVIOUS APPLICATIONS: AHOI{NT DUE T{ll.q REQUEST: 30,636.31 3,654.04 S.Y.B~ySTRUCTION CO. ,INC. l~"[. ~ 24-[~9 S'UI'I'ORT D~CUM'EI'ITATTON FOR AC, ENDA ITEM STAMP RE(H;I¥].:,D BY CITY MANAC',ER~S OFFICI';: SUPPORT DOCUMENTATION SUBMITTED WITII AC, Eb~A I FEM: MEMO S/LETTERS/I1EPORTS/BILLS/MINUTES: NO. 0¥ ORIGINALS REQUIRED 1 each CON%I'ACT/AGRE~IENT · C I P CONTI~CT · CIIANGE ORDERS . ' 3 originals for signature 6 originals for signature~ 3 originals for signature ORDINANCE ........................... : CAPTION ............................. : RESOLUTION .......................... : PROCLAMATION ........................ : i blueback for signa~u~m'+ 3 cop2e~ 1 blucback for uignagure + 3 copie~ 2 bluebacks for signagure + 1 copy 2 bluebacks for signa~ur~ + 1 copy BiD ' 1 each LOCATION MAPS ....................... : ZONING PLANS ........................ : I'RELIMINAIiY/FINAL PLATS ............. : SITE PLANS .......................... : LANDSCAPE PLANS ..................... : ARCHITECTUP. AL RENDERINGS ............ L2 12 12 ,12 12 12 DATE PUBLISItED IN TIlE CITIZ'2NS~ ADVOCATE: NOTIFICATION TO: DA'].'E/METIIOD OF CONTACT: APPL [CATIOH FUR TI): City of Coppell lq~oH: S.Y.B. Construction Co., Inc. - Contractor PRO,IECF TITLE: Hill Street Drainage P YMENI. REQUEST ~ 3rd & FINAL PERIOU ENUING 8-31-90 I'I'EH NC} 2 3 5 6 7 8 #1 DESCRIPTION Saw Cut Pavement Remove Pavement 6" Conc. Pavement Single Grate Inlet Dbl. Grate Inlet [8" RCP 36 x 36 x 60 Wye Trench Safety Change Order UNIT OF NEASURE LF SY SY EA EA LF EA LS LS BiD 791.00 570.00 570.00 1.00 1.00 275.00 1.00 1.00 1.00 PREV QTY'.' COMPL 791.00 57O.OO 570.00 1.00 1.00 275.00 0.75 1.00 1.00 QTY CO~PL EST, 0.00 0.00 0.00 0.00 0.00 0.00 0.25 0.00 0.00 TOTAl, QTY' CoMPL 791.00 570.00 570.00 1.00 1.00 275.00 1.00 1.00 1.00 ~NIT PRICE 1.75 10.81 24.42 1000.00 1450.00 29.00 1000.00 4OO.OO 1000.00 VALUE OF WORK 6,161.70 13,919.4~ 1,000.0C 7,975.0£ 1,O00.OC 400.0( '1,000.0( OR. IGI.NAI, CONTRACT AHOUNT: TOTAl, cIIANGE ORI)ERS; 'tOTAL CONTRACT AHOUNT 1'0 UATE: TOTAl, VALUE OF WORK TO I)A'FE: TOTAL VALUE OF WORK PERFORI, IEI) PREVIOUSLY; TOTAL TO UATE; 33.290.35 1~000.00 34,290.35 34,290.35~' 34,040.0~ 34,290.35 -0- 30,636.31 LESS ANOUNT OF RETAINAGE TOTAL LESS RETAINAGE: TOTAl, PREVIOUS APPI,1CATIONS: AHOUNT DUE Tills RE(}UEST,' 3,654.04~ S.Y .B. ~',~STRUCTION CO., IN(:.