Vista Ridge Retail, L5-CS080507
THE.CITY.OF
COPPELL
May 7, 2008
Michael Doggett, P.E
Winkelmann & Associates
6750 Hillcrest Plaza Dr., Ste. 100
Dallas, TX 75230
RE: Vista Ridge Retail, Lot 5 Block A
Fee Assessment Leiter
Dear Mr. Doggett:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $7,950.00 and forward
to the Engineering Department along with a copy of the Fee Assessment table. In addition, $7,482.06 \vill
need to be paid as part of the Pro-Rata Agreement. These amounts are a portion of the assessed fees that
need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due
and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate
or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction
inspection fees must be paid prior to scheduling a pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
Mi~EIT
Graduate Engineer
cc: Jennifer Miller, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project:
Date:
VistaRidge Retail, Lot 5 Block A
5/6/2008
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $0.00
(l 00% due at Issuance of Building Pennit)
Water Tap Inspection Fee $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fircline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation!Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% clue prior to Filing Plat)
Roadway Impact Fee $7,950.00 $7,950.00
(100% clue prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
Pro Rata for 8" Waterline $7,482.06 $7,482.06
(100% due prior to Start of Construction)
ITOTAL II $7,950.00 I
TOT AL AMOUNT DUE PRlOR TO FILING FINAL PLAT $15,432.06
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
VistaRidge Retail, Lot 5 Block A
5/6/2008
Water Impact Fcc:
Domestic Meter(s) 0 = 0 ESU's
Irrigation Meter( s) 0 = 0 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #
o ESU's @ $90000 ea.
(Due prior to issuance of building permit)
$000
Water Tap Inspection Fee:
Total #
o Connections @ $50.00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$0.00
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$0.00
Irrigation/Fircline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total # 0 Flreline Meter(s) @
(100% due prror to issuance of water meters)
$000
$000
$000
$0.00
$0.00
meter provided by developer
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $3000 ea
(100% due prror to issuance of water meters)
$000
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$0.00
Wastewater Impact Fee:
Total Domestic Meters ESU's 0 @ $90000 ea
(Due prior to issuance of building permit)
$0.00
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $5000 ea.
(100% due prior to issuance of building permit)
$000
lJtility Final Inspection Fee (All developments):
Total # 0 Lots @ $50.00 ea
(100% due prior to issuance of building permit)
$0.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Prelimina'1' plat approved:
After October 26, 1993
o
o
Single-family @ $0.00 per lot
Multi-family @ $000 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Li~hting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T. U ElectriC submits
the lighting plan for the proposed development.
Once the plans are submitted, $29260 per light will be assessed
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for slgnage in the City's right-of-way
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are Inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
$000
$0.00
$7,950.00
Information not Available
Information not Available
Information not Available
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
VistaRidge Retail. Lot 5 Block A
5/6/2008
ROADWA Y IMPACT FEE:
Service Area * I
Category ** Retai IICommercial
Land Use * * Gasoline/Service Station with Conv
No. Fuel Positions 10
Development Units ** 10.00
Vehicle Miles per Development Unit ** 5.3
Fee per Vehicle Mile *** $150
Roadway Impact Fee due ~ (Development Units) x
(Vehicle Miles per Development Unit) x (Fcc per Vehicle Mile) = $7,950.00
* (Figure 4. I - Roadway Impact Fee Study)
* * (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
AMOUNT DUE:
$7,950.00 I
Pro Rata Calculations
Pro Rata For Waterline
PROJECT: Vista Ridge Retail Lot 5 Elk A
DA TE: 5/7/2008
$6298.03/Acre
Lot 1 = 1.188 Acres X $6298.03
Amount Due:
$7,482.06