Loading...
Arbor Manors-LR080411 ~ 05/14/2008 12:55 9724068023 ALPHA TESTING PAGE 03/16 I'. ALPHA TESTING, INC. 2209 Wisconsin St.. SuIte 100 DOl/os. Texos 75229 972/620-8977 - 972/263..4937 (Metro) FAX: 972/406-8023 ex REPORT OF FIELD COMPACTION TESTS TESTED FOR: John Baker Corporation CIO Priority Development, LP Houston. TEXAS DATE: 04/11/08 PROJECT: Arbor Manors Coppell, Texas OUR REPORT NO.: 080332-7 TEST DATA: TEST ~ SOil 10 OPTIMUt.l IIWlIMUM ~"'B IN I'I.4CE IN P\.ACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE MY OEN$llY COMMENT- NO DE PTH NUMBER .... PCF 110 fieF COMP^CTION 29 04/1110B SG 1 11.6 111.7 12.7 108 97 2-A 30 04/11108 SG 1 11.6 111.7 13.4 107 96 2-A 31 04/11108 5G 1 116 111.7 12.1 110 99 2-A 32 04/11/08 SG 1 11.6 111.7 13.4 107 98 2-A 33 04/11/0B SG 1 11.6 111.7 11.2 110 99 2-A 34 04/11/08 FG-.7 1 11.6 111.7 13.3 108 96 1-A 35 04/11/08 FG-2.0 1 11.6 111.7 13.5 107 96 1-A TEST LOCATION' PADS 29 70' SOUTH AND 40' EAST FROM THE NORTHWEST CORNER OF BLOCK C, PAD 1 30 30' SOUTH AND 60' EAST FROM THE NORTHWEST CORNER OF BLOCK C, PAD 3 31 25' SOUTH AND 25' EAST FROM THE NORTHWEST CORNER OF BLOCK C, PAD 5 32 3D' SOUTH AND 40' EAST FROM THE NORTHWEST CORNER OF BLOCK C, PAD 7 33 25' SOUTH AND 60' EAST FROM THE NORTHWEST CORNER OF BLOCK C. PAD 9 34 30' SOUTH AND 70' EAST FROM THE NORTHWEST CORNER OF BLOCK C PAD 4 35 20' SOUTH AND 40' EAST FROM THE NORHTWEST CORNER OF BLOCK C. PAD 6 1 FI1.L 2. NATURAL SUBGAADE ~. LIME STABILIZED 4. CEMENT TREATED . A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPI.V WITI'l SPECIFICATIONS e. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST ~' samplon ChIn ALPHA "TESTING. IHC Our lest rellllUl1imI:f ,eopOtla ere fOr \he DlIellJ.lv. uroa of the Cll.n, land tn.lr d..ignlled ~'phtnl' on nt. In our clf\e.) ,"d "'usll "~b4 '.GcluC4Jd an./ar dllUlbulod ~J11I!A,.1 wllh aJCp",~~ i!'f"PI'Bv.1 or ALPf4A. ThO u.~.r 0\" nom' 3M le.1 r..ul.. mUll ,."...Ivo Ou' vIIllt.n opp"'vll T.., ro.ufl. ond '.p.rU IPply only I" Ihl l"",plU ',,"I"d ,NI/o. Obte",.d. and.,,, ~o, ;fldICllIi.o or Ihs <lVlhll,. 0' op~renlly IdlU'~tlc~1 Of limlllu as:Jactf'ft8l'\1 Geotechnical Engineering & Construction Materials Testing & Environmental Engineering & Consulting 05/14/2008 12:55 9724068023 ALPHA TESTING PAGE 04/16 I~A TESTING. INC. 2209 Wisconsin st., Suite 100 Dallas, T9)((]$ 7522Q 972/620-891 7 - 972/:163-4937 (Metro) FAX: 972/406-8023 C>< REPORT OF FIELD COMPACTION TESTS TESTED FOR: John Baker Corporation C/O Priority Development. LP Houston, TEXAS DATE: 04/11/08 PROJECT: Arbor Manors Cappelli Texas OUR REPORT NO.: 080332-7A TEST DATA: TEST ~. SOILID OPTIIIlUM MPJ<IMUM LAIl IN I'LAC~ IN PLACE I'E~CiNT DATE MOISTUAf DRY DENSITY MOISTURE. DRY OENSITV COMMENT" NO, DE PTH NUMB~R '4 PCF \to PC' COMPACTION 36 04/11/06 SG 1 11,6 111.7 12.8 108 96 2.A 37 04/11/08 SG 1 11,6 111.7 13.4 107 96 2-A 38 04/11/08 SG 1 11,6 111.7 11.6 110 98 2.A 39 04/11/08 SG 1 11.6 111.7 13.4 107 96 2-A 40 04/11/08 SG 1 11.6 111.7 12.1 110 98 2-A 41 04/11/08 SG 1 11.6 111.7 13.4 107 96 2-A 42 04/11/08 FG-7.7 1 11.6 111.7 13.1 106 96 1-A TEST LOCATION' PADS 36 30' SOUTH AND 60' EAST FROM THE NORTHWEST CORNER OF BLOCK E PAD 1 37 25' SOUTH AND 40' EAST FROM THE NORTHWEST CORNER OF BLOCK E, PAD 3 38 30' SOUTH AND 3D' EAST FROM THE NORTHWEST CORNER OF BLOCK E, PAD 5 39 20' SOUTH AND 70' EAST FROM THE NORTHWEST CORNER OF BLOCK E, PAD 7 40 40' SOUTH AND 40' EAST FROM THE NORTHWEST CORNER OF BLOCK E, PAD 9 41 30' SOUTH AND 50' EAST FROM THE NORTHWEST CORNER OF BLOCK E, PAD 11 42 25' SOUTH AND 60' EAST FROM THE NORTHWEST CORNER OF BLOCK E, PAD 2 1 FILL 2 NATURALSUBGRADE 3. LIME STABILIZED 4 CEMENT TREATED . A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIF"ICATIONS 8. PERCENT COMPACTION oOES NOT COMPLY WIT~ SPECIFltA110NS C PERCENT IN PLACE MOISTURE DOES NOT COMPL V WITH speCIFICATIONS D. RE1EST J;::~ Sampson Chan ALPHA TESTING, INC. Our lest l'tIf:ultl. ;:and report..t ." rcr thg OIfCluli"e u,. or tho Chen' (an" 'n"lr datl(l,f'llltd r.cl~~'. on R161" CUt Oftlt;8' I!'f'1d Shall not be ,eprOCluN(f ondlar d.l,Ibl.I'~ ..cept wll'" o..prt".. .pproval at A.lPHA Th~ lilt. 0' our "I",.. and 11.1 f,!,.uH!i n'lu.t reCelv, our Wl"'illeJ"l 6C'prOVQI, T4HII tl!Uullt '"ell "poria IIpply only to Ine '(lImpl." tosLed andlOr otJ,l!lu'ynd, Ol"td are nOllnQleAllva Dr 1"1 auell',"-c' IiIppnrentl)' i~.nllcal or ,slmll.r !pttelM&nt. Geotechnical Engineering & Construction Materials Testing & Environmental Engineering & Consulting