Loading...
Braewood North-LR080221 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: C. R. Buell Co. DATE: 21 February 2008 PROJECT: The Gable 123 E. Sandy lake Rd., Coppell, TX JOB NO.: 08.1001 MA TERrAL DESCRIPTION: 1) On-Site Fill - Brown Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 100.0 pcf @ 20.5% Moisture MOISTURE DRY PERCENT REQUIRED lOCA TION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW Buildina Pad SUBGRADE 25) approx. 20' S of N bldg. line 1 ' 23.6 92.6 92.6 92-98 approx. 35' W of E bldg. line Min. +3% Over Optimum 26) approx. 15' N of S bldg. line 1 ' 24.9 93.3 93.3 approx. 25' E of W bldg. line 27) approx. 10' S of N bldg. line 1 ' 25.2 95.5 95.5 approx. 20' E of W bldg. line TECHNICIAN: CDJ DISTRIBUTION: (2) C. R. Buell Co. (1) Plan Solutions Architects ~ !?-- 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148