DR9002-CS 900907FILE COPY
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: September 7, 1990
TOt Per Birdsall, Street Superintendent
M. Shohre Daneshmand, Acting City Engineer
Ben dela Cruz, Engineering Staff
FROM=~arry Davis, Construction Inspector
REs Hill Drive Drainage
A final inspection of the above referenced project has been
requested by the utility and paving contractor.
The final walk through will be conducted on Tuesday, September
11, 1990 at 9~00 A.M..
If I can be of further assistance, please.let me know.
Thank you.
CLD/bd
HILLDRIVE.CLD