Loading...
DR9002-CS 900907FILE COPY COPPELL PUBLIC WORKS MEMORANDUM DATE: September 7, 1990 TOt Per Birdsall, Street Superintendent M. Shohre Daneshmand, Acting City Engineer Ben dela Cruz, Engineering Staff FROM=~arry Davis, Construction Inspector REs Hill Drive Drainage A final inspection of the above referenced project has been requested by the utility and paving contractor. The final walk through will be conducted on Tuesday, September 11, 1990 at 9~00 A.M.. If I can be of further assistance, please.let me know. Thank you. CLD/bd HILLDRIVE.CLD