Loading...
Duke Lesley-CS080307 tlv4 L~. ~~. North Central Texas Council Of Governments March 7, 2008 Mr. Ken Griffin Director of Engineering/Public Works City of Coppell P.O. Box 9478 Coppell, TX 75019 Dear Mr. Griffin: Enclosed is Modification Number 2008-095, which is a modification to the 2008-2011 Transportation Improvement Program (TIP). The individual action associated with this modification is outlined below. This modification was approved by the Regional Transportation Council (RTC) in October 2007 and received federal approval on December 10, 2007. Modification TIP CSJ Project Description Action Number Project IH 635 from Belt Line Road to Add project to 2374-07-058 .55 miles West of Belt Line the TIP and 2008-095 N/A 2374-07 -937 Road; Widen Westbound STIP; 100% Frontage Road locally funded bv Connell The Texas Department of Transportation (TxDOT) Dallas District is implementing this project. Since it is in your area, we wanted to make the City of Coppell aware of the new project. If you have any questions or require additional information, please contact Omar Barrios or me at 817/695-9240. Sincerely, e h4JufdL- Christie Jestis Program Manager OB:lc Enclosures cc: Wes McClure, P.E., Special Services Engineer, TxDOT-Dallas 616 Six Flags Drive, Centerpoint Two P. O. Box 5888, Arlington, Texas 76005-5888 (817) 640-3300 FAX: 817-640-7806 (i) recycled paper www.nctcog.org TRANSPORTA TION IMPROVEMENT PROGRAM MODIFICATION Subregion: EASTERN Program(s): .. CMAQ Type of Modification: STP-MM Transit -Ii' Other 10 MISCELLANEOUS Administrative ;j Current RTC Action Previous RTC Action Modification Number: 2008-095 STIP Revision Required?: YES NCTCOG Project Code(s): NiA NCTCOG TIP Page Number(s): N/A MTP Reference(s): FR1 1345 TXDOT Control Section Job Number(s): 2374-07-058.2374-07-937 Original Project Scope and TXDOT-DALLAS (DALLAS COUNTY/COPPELL)--IH 635 FROM BELT LINE ROAD TO 0.55 MILES Location: WEST OF BELT LINE ROAD; WIDEN WESTBOUND FRONTAGE ROAD Original Funded Amount: FY08-$800,350 TOTAL ($800,350 LOCAL) Estimated Construction Cost: N/A Percent: N/A Construction Bid Price: N/A Percent: N/A Request: ADD PROJECT TO THE 2008-2011 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP); 100% LOCALLY FUNDED BY COPPELL Financial Constraint Statement: NO NET IMPACT ON FINANCIAL CONSTRAINT AS PROJECT IS 100% LOCALLY FUNDED Air Quality Conformity Statement: THIS PROJECT IS CONSISTENT WITH MOBILITY 2030 AND THE RESULTING AIR QUALITY CONFORMITY ANALYSIS Other: ii Contingent on TxDOT approval? YES Certified by: ~~-=-~O\ .C\~ Michael Morris, P.E. '\ Director of Transportation NCTCOG The following signature authorizes: additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One. \0 - ~I -0'"1 Date " modification to a project funded through a TxDOT-selected program. Certified by: ---_.I2~_~._ __ William H~le'-pO.--. District Engineer TXDOT, Dallas District (()/t, t7 ------ -- -~-~~-_._---~ ----..---- Date