Loading...
Alexander Ct-CS080422 ~. OmLO'M,", ,~,/ / aJt CORPORATION (d/ Pl t Master Planned Living Mr. Kenneth M. Griffin, P.E. Director of Engmg. & Public Works 255 Parkway Coppell, Tx. 75019 April 22, 2008 Re: Alexander Court Connecting Retaining Walls Dear Sir, I have enclosed copies of the perimeter wall "construction detail plan", Rev. 7, dated 04/14/08 and revised copies of the lot grading plan, showing "additional retaining wall grades" dated 04/19/08. David Weekley Homes has chosen to connect the retaining walls between lots 5 & 8 and at the back of lot 29. Tim Bennett's revised plan indicates the interim grades necessary to facilitate this new construction. TRW believes it would be the most cost efficient to build the new walls and the perimeter wall at the same time. Survey alignment and grade staking is complete and TRW is ready to start. The 4: 1 slopes must be removed and James Arnold Const. is available to do that immediately. This work needs to be done before the franchise utilities start their work. The construction permit for Atmos Energy has lapsed and must be reissued. Circle "J" Boring has had to wait for some materials to be delivered and their owner has been incapacitated for 3 months. By virtue of this letter, please accept this as my urgent request for James Arnold and TRW to be allowed to proceed immediately, with the necessary additional dirt work and retaining wall construction. Under the present conditions, your expeditious approval and permission to proceed, will be a welcome accommodation and certainly will facilitate the most practical means to satisfy David Weekley's request. If this is acceptable, please advise, so Larry Davis and all interested parties will know that we are allowed to proceed on this basis. Thank You. . . Attached, cc: Larry Jackson, DWH Gary Gregoire, TR W James Arnold, JBA Walter Leonard, Esquire Yours Very Truly, John L. Hawkins, Pres. 6003 Sunderlancl Drive · Colleyville, Texas 76034 Tel. (817) 996-6698 . Fax (817) 329-1792