Loading...
ST0003-CS080613 THE.CITY.OF COPPELL l' June 13, 2008 Lance Smith Tiseo Paving Company P.O. Box 270040 Dallas, Texas 78019 RE: Coppell Road ST 00-03 Utility Conflicts Dear Mr. Smith: I am in receipt of your letter of June 12, 2008 regarding utility conflicts and your request for additional time on this project. The General Provisions of the North Central Texas Standard Specifications for Public Works Construction as well as the Special Provisions address the issue of unknown utilities. These provisions clearly state that the city can not be held liable for any additional work unless a conflict requires the building of special work. As difficult and time consuming as it may have been to identify and locate these utilities, it does not warrant additional compensation, or granting of additional time under the provisions of the contract. The utility poles on the south end of the project do not appear to be in conflict with the proposed water line location. The water line appears to be from one to three feet away from the existing poles as scaled from the plans (edge to edge). The city inspector can work with your sub contractor to meander this line at the pole locations as necessary to complete this installation. Any request for additional time will only be granted upon demonstration that the delay has caused an adverse impact to the critical path in accordance with provision 1.36. Please call me with any questions or comments concerning this item. Sincerely, ~~ Keith Marvin, P.E. Project Engineer Phone: (972)304-3681 Fax: (972)304-3570 cc: Albert Samaniego, Construction Inspector 255 PARKWAY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673