Loading...
DR9002-CS 900626DATE: COPP~?.T. PUBLIC WORKS June 26, 1990 Shohre Daneshmand, Acting City Engineer Larry Dav~struction Inspector Hill Drive Drainage A meeting to discuss the construction of the Hill Drive drainage project was requested by several residents adjacent to the project. This meeting was held at Mr. Steve Cobb's home located at 140 Mockingbird on Monday, June 25, 1990 at 7~30 P.M. The items discussed were as follows~ Adjusting the construction sequence from one construction phase to two phases - Change order. (see attached) Rear entry parking at this time in phase two section. 3. General construction information i.e. - excavation, placement of R.C.P., placement of concrete paving section, and cure time. 4. Final clean-up of project after phase two is complete. A request by the residents adjacent to Phase two requested three day notification before construction comenced on Phase Two. Attending the meeting were~ Tom Sherrill Greg Smith Jeni Cyr Justin Twa Gall and Steve Cobb Cheryl Kubic Marsha Trumpsheller If I can be of further assistance, please let me know. Thank you. CLD/bd cc~ Ben Steve HILL2.CLD