MEMORANDUM
June 22, 1990
Steve Goram, Director of Public Works
Larry Day'Construction Inspector
Hill Drive Drainage
Status Report
Construction activity began on the Hill Drive Drainage Project
Monday June 18, 1990. Construction progress began with the removal
and replacement of the concrete paving section located in the
intersection between Hill Drive and Mockingbird.
A request was made to phase the RCP and inlet construction into
two sections.
The request was placed into a change order and approved by the City
Manager June 22, 1990.
As of June 22, 1990 the work area was limited to Phase i only. See
attached.
Monday, June 25, 1990, at 7~30 P.M. a meeting with the residence
with property adjacent to Phase i and Phase 2 will be held at Mr.
Steve Cobb's home, 140 Mockingbird, to discuss the two construction
phases, and the property owner concerns regarding construction.
If I can be of
Thank you.
CLD/bd
HILLDRIVE.CLD
Shohre
Ben
further assistance, please let me know.