REPORT OF FIELD TESTING OF CONCRETE
TESTED FOR:
YNES
HYNES GENERAL CONTRACTOR
TRINITY VIEW RD
EATHERFORD, TX 76087
PROJECT: CHICKEN EXPRESS RESTAURANT
COPPELL, TX
DATE:
June 12, 2008
PSI REPORT NO.: 341-80040-12
FIELD DATA:
Concrete was delivered by Southern Star, mix number 9341.
NO. OF CONCRETE CUBIC TEMPERATURE, OF
SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR
SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP. in. CONTENT, % AIR CONCRETE
I 1120 4 1288883 12:15 am 01:25 am 10.0 5 1.2 94 99
I
i
I
I
I
i
LOCATION:
Piers
1120 piers 23, 22, 21, 20
NOTE: APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED: MAKING SPECIMENS: CJ1 (EXC. SEC. 10.1.2): SLUMP: C143: AIR CONTENT: C231 (EXC. SEC. 6): TEMPERATURE: C1064: SAMPLING: C172
REMARKS:
fll~
TECHNICIAN: Kirk See Respectfully submitted,
~I '.JI ,I)Profe;.onal Senllce Industries, Inc.
cc: Hynesi Davisi Stone qrj ~ " (If
THESE TEST RESUL TS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT A
REPORTS MAY NOT BE REPRODUCED EXCEPT IN FULL WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC V
PSI A.2DO-l (8)F
Professional Service Industries, Inc.' 4087 Shilling Way. Dallas, TX 75237' Phone 214/330-9211 . Fax 214/467-0031
l-~ ;1 InfoT71U1tion
~.,. .To Build On
Engineering. Consulting. Testing
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
RANDY HYNES
RANDY HYNES GENERAL CONTRACTOR
101 TRINITY VIEW RD
WEATHERFORD, TX 76087
PROJECT:
DATE:
June 12, 2008
REVISION #1
PSI REPORT NO.: 341-80040-13
FIELD DATA:
LOCATION OF PLACEMENT
piers
Piers 23, 22, 21, 20
DATE PLACED June 12, 2008 SUPPLIER Southern Star
TIME 12:45 am DELIVERY TICKET NO.n-RUCK NO. 1288883
SLUMP, IN. 5 MIX NUMBER AND PROPORTIONS 9341
AIR CONTENT, % 1.2 CEMENT
AIR TEMPERATURE, of 94 WATER
CONCRETE TEMPERATURE of 99 FINE AGGREGATE
DATE RECEIVED IN LAB June 13, 2008 COARSE AGGREGATE
FIELD DATA SUBMITTED BY PSI\Kirk See ADMIXTURE
MIX DATA SUBMITTED BY Southern Star
NOTE' APPLICABLE ASTM STANDARDS UNLESS OTHERWISE !NDICATED- SLUMP: C143" AIR CONTENT C231 IEXCLUDING SEe 6)' TEMPERATURE- C1064' CYLINDERS' C31 (EXCLUDING SEe 1012)" SAMPLING' C172
COMPRESSION TEST RESULTS
ASTM C39; C 1231
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE TYPE OF BREAK,
LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH AS SHOWN IN
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (sa. IN.) (PSI) ASTM C39
1120 A 7 06/19/08 81960 6.00 28.27 ~900 Type 1
1120 B 28 07/10/08 117620 6.00 28.27 160 Type 2
1120 C 28 07/10/08 128040 6.00 28.27 530 Type 2
1120 D H HOLD
Kevin Cal
3000
SPECIFICATIONS
28
REMARKS:
X Cylinders made by PSI representative.
x
Test results comply with applicable
specifications.
Cylinders made by Architect's or
Contractor's representative.
TECHNICIAN:
Respectfully submitted,
Professional Service Industries, Inc.
cc: Hynes; Davis; Stone
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT