Loading...
Northlake College-LR080618 )::::?~~;-~'\ KLEINFELDER 2211 Century Center Blvd Ste. 101 Irving, Texas 75062 Phone: (972) 870-0808 Fax: (972) 870-0802 ~,.; Bright People. Right Solutions. ":"III:IIIJ;I:i.JIII:B'9gl'lftlii"!fi"lm-r~;INlrnl:'RIIIli~":.!lmM:i~~~.:::::(H Report Date: 6/18/2008 Report To: Project No.: 87015 Project: North Lake College, N Campus Task: 1 Task 1 Brenda Spinelli Dallas County Community College DCCCD Bond Program Office S. Side 1505 S. Lamar, Suite 1015 Dallas, TX 75215 . ............O:i.....:'......i............'....,.,.... ....':..:,:.).............::..::...:....'.:)((.,.,.:'.........:....:....:............... .MJX:'QeSJQlN..OATiJ .:...:....................:..'........................:...........:.....:....::.................. .. . ...... -...... .. .. ......-......... .................................................,....-......................................... .....................-..............................................................y........................................... ......................................................................-...............,................ Supplier: Southern Star Cement Factor (sk/cy): Mix No.: 9339 Max. Size Agg.(in.): Cement Type: Admixtures: ...........-........,......,..,..,.... - ,..........., "...................... -. ... "..,......., ""." ....., .. . '." ........ ......... ..............-...-................ ......'.........-....:................'........................................... .. .....\..........\\..//..)?U...U..)'/UUUUUU....'\/..U..'.../........USAMPCeDATA, .<<<<<: ...........................'.'.""...,.,............ . ......._-...-........'.'......_.........................................'...........'..'.......'..........'......-.......'....'.............'.....................................'.'.........:.-.:...;.:-..;.:.:,..:-:-'.:-:.":-:...;.;....................:.....:-: ..;..-:.....:.....-:.......:.:...;.....:.....;.:...,......-:.:.... :...:-:...:.:.'...:...:-:-:........ Date Sampled: 5120/2008 Date Received: Time Batched: 8:00 AM Source of Sample: Sidewalk Time Sampled: 8:33 AM 150' N of S entrance on the E side of campus Batch Size (cy): 10 Water Added (gal): 10 Contractor: Con Sys TrucklTicket: 6233/1269383 Sampled By: Jonathon Mayo Submitted By: Jonathon Mayo Curing Method: Cure Room Field Cure Temp (OF) Hi: La: Field Cure Time: Specified Measured Min Max Slump (in) 7.0 SlumD w/Dlasticizer (inl Ambient Air Temperature (OF) 80 Mix Temperature (OF) 84 Air Content (%) 1.9 Unit Weiaht (pct) Time in Truck (mins.) 33 ,/:...)::..n:..:~i:lQfmro91Y:PAl~.. .........................,...,.... ..............................,.. .....,...,...........-..-.. .............................. .... .............. ................... Capping Method: Unbonded Sample Date Age Oimensions (in) Area Ultimate Load Compressive Required Number Tested (days) Diam. Height (in2) Fracture Type (Ibs) Strength (psi) Strength (psi) DAL58095A 5/27/2008 7 4.00 8.00 12.57 Type 4-Shear 52,390 4,170 4,000 DAL58095B 6/17/2008 28 4.00 8.00 12.57 Type 2-Cone and Split 66,620 5,300 4,000 DAL58095C 6/17/2008 28 4.00 8.00 12.57 Type 5-Side Fracture 64,650 5,140 4,000 DAL58095D Hold 4,000 Average 28 Day Strength (psi): 5,220 7L (. 7-;r-- Associated Test Methods: ASTM C 31, C 138, C 143, C 172, C 173, C 231, C 617, C 1064, C 1231 Unless prior arrangements have been made all HOLD specimens will be discarded if required strength is attained. Limitations: Pursuant to 2006 IBC Section 1704, the results presented in this report are for the exclusive use of the client and the registered design professional in responsible charge. The results apply only to the samples tested. If changes to the specifications were made and not communicated to Kleinfelder, Kleinfelder assumes no responsibility for pass/fail statements (meets/did not meet), if provided.