ST0003-SY031110 GEOTECHNICAL REPORT COPPELL ROAD RECONSTRUCTION COOPER LANE TO SANDY LAKE ROAD CITY OF COPPELL, TEXAS TMI REPORT NO. DE03-118 Prepared for HUITT-ZOLLARS, INC. DALLAS, TEXAS Prepared by: TERRA-MAR, INC. DALLAS/FORT WORTH/HOUSTON/AUSTIN NOVEMBER 10, 2003 RECEIVED NQV 14 2003 Huitt-Zollars DE03-118 TERRA-MAR TERRA-MAR Consulting Engineers. Geotechnical. Environmental. Construction Materials Testing DALLAS · FORT WORTH · HOUSTON · AUSTIN · LONGVIEW November 10, 2003 Mr, Kenneth A. Roberts, P.E. Huitt-Zollars, Inc. 3131 McKinney Avenue, Suite 600 Dallas, Texas 75204-2489 Tel. 214-871-3311 Fax 214-871-0757 Re: Geotechnical Report Cop pel! Road Reconstruction Cooper Lane to Sandy Lake Road City of Coppell, Texas TMI Report No. DE03-118 Dear Mr. Roberts: The attached report presents the results of the geotechnical investigation performed for project referenced above. This report presents the results of boring and laboratory tests together with recommendations for a concrete pavement section and subgrade preparation for the Coppell Road reconstruction. This study was performed in accordance with TMI Proposal No. P03-1530 dated February 20, 2003. We appreciate the opportunity to have been of service. If you have any questions or require additional information, please do not hesitate to contact us. Sincerely, TERRA-MAR, INC. ./' 11050 Ables Lane, Dallas, Texas 75229 Phone: 972-488-8800 Fax: 972-488-8080 TABLE OF CONTENTS PAGE 1 .0 I NTRO DU CTI 0 N --------------------------------------------------------------------------------------1 1.1 PROJECT DESCRIPTION ----------------------------------------------------------------1 1.2 PURPOSE AND SCOPE __n____________________________________________________----------1 2.0 FIE LD EXP L 0 RAT ION ------------------------------------------------------------------------------- 1 3.0 LABO RA TO R Y TE ST IN G --------------------------------------------------------------------------- 2 4.0 SUB SUR FA C E CO N 0 IT ION S --------------------------------------------------------------------- 2 4. 1 SO I L CO N 0 ITI 0 N S ------------------------------------------------------------------------- 2 4.2 G R 0 UN OW ATE R CO N 0 IT ION S -------------------------------------------------------- 3 5. 0 PAVE M E NT RE CO M MEN OAT ION S ------------------------------------------------------------- 3 5. 1 PAVE ME NT SECT ION --------------------------------------------------------------------- 3 5.2 PAVEMENT SUBGRADE PREPARATION ------------------------------------------- 3 5.3 LI M E S TAB I L I ZA T ION --------------------------------------------------------------------- 4 5 .4 PAVE M E NT CO N SID E RAT ION S ------------------------------------------------------- 4 6.0 CONSTRUCTION MONITORING AND TESTING ____________________________________________5 7.0 L I M ITA TI ON S ______________________________________________________------------------------------------ 5 ILLUSTRATIONS FIGURE PLAN 0 F BO R I N G S ______________________________________________________------------------------------------- 1 LOG S 0 F 80 R IN G S ________________________________________________________------------------------------- 2 - 9 KEY TO DESCRIPTIVE TERMS AND SYMBOLS---------------------------------------------------- 10 RESULTS OF SOLUBLE SULFATE TESTS -----------------------------------------------------------11 RE S U L T S 0 F P 1- LI ME S E R IE S -------------------------------------------------------------------------- 12 DE03.118 TERRA-MAR GEOTECHNICAL REPORT COPPELL ROAD RECONSTRUCTION COOPER LANE TO SANDY LAKE ROAD CITY OF COPPELL, TEXAS 1.0 INTRODUCTION 1.1 PROJECT DESCRIPTION The project includes reconstruction of about 3,500 linear feet of Coppell Road from about 150 feet south of Cooper Lane to about 350 feet south of Sandy Lake Road in Coppell, Texas. The existing Cappel! Road is a 2-lane roadway with a flexible pavement section. The existing roadway is about 22 feet wide and has a drainage ditch on both sides of the roadway. The bottom of the drainage ditch is about 2 to 6 feet below the top of existing pavement. The new widened roadway will be about 34 to 37 feet wide with one lane in each direction and a parking or a turning lane. The new roadway will have a reinforced concrete pavement section. The City of Coppell's standard pavement section for "Type C-2U" roadway is planned. The City of Coppell typically requires lime treatment of subgrade soils. 1.2 PURPOSE AND SCOPE The purpose of this investigation was to provide recommendations for reconstruction of the planned section of Coppell Road. Our scope of services included the following: 1. Explore the subsurface conditions along the proposed Coppell Road alignment. 2. Provide recommendations for a concrete pavement section based on the City of Coppell's standard pavement section. 3. Provide recommendations for pavement subgrade preparation and subgrade treatment. 4. Discuss potential construction problems, such as groundwater and presence of soft subgrade soils. 2.0 FIELD EXPLORATION Eight borings were drilled for this project to depths of 10 feet. The borings were continuously sampled to the boring termination depths. Soil samples were obtained with standard, thin- walled, seamless tube samplers. Groundwater level observations were made at each boring location at completion. Borings were backfilled after water level measurements. Where DE03-118 PAGE 1 TERRA-MAR applicable, the top 4 to 6 inches of the boring was patched with quick setting concrete or cold mix asphalt to match the existing pavement. The borings were drilled at the approximate locations shown on the Plan of Borings, Figure 1. The results of the field investigation are presented on the attached Logs of Borings, Figures 2 through 9. A key to the descriptive terms and symbols used on the logs is presented on Figure 10. Elevations shown on the logs were provided by Huitt-Zollars. 3.0 LABORATORY TESTING A laboratory-testing program was implemented to evaluate the pertinent engineering properties of the soil formations. Laboratory testing included moisture content, liquid and plastic limits, percent passing the No. 200 sieve, and hand penetrometer tests. The laboratory test results are presented on the Logs of Borings. Soluble sulfate tests were performed to evaluate the potential for lime-sulfate induced heave. Results of the soluble sulfate tests are presented on Figure 11. A PI-lime series was perfromed to determine the optimum lime dosage for lime treatment of the subgrade soils. Results of the PI-lime series are presented on Figure 12. 4.0 SUBSURFACE CONDITIONS 4.1 SOIL CONDITIONS Descriptions of the subsurface conditions encountered in the borings, including descriptions of the various strata and their depths and thickness, are presented on the Logs of Borings. A brief summary of the conditions encountered in the borings is presented below. The depths discussed in the report are referenced to the ground surface that was present at the time the borings were drilled. Boundaries between the various soil types are approximate. Most borings were drilled in the existing pavement of intersecting streets. The borings were drilled about 5 to 15 feet from the edge of the existing Coppell Road pavement. Fill soils were encountered in all borings except Borings B-5 and B-6. Fill soils extended to depths of 1.5 to 3 feet in the borings and consisted primarily of sandy clays and clayey sands with varying amounts of gravel. Sandy gravel fills extended to depths of 1 to 2 feet in Borings B-3, B-7 and B-8. A sample of sandy clay fill exhibited a liquid limit of 38 percent and a plasticity index (PI) PAGE 2 TERRA-MAR DE03-118 of 23 percent. The clay fill soils were stiff to hard in consistency exhibiting hand penetrometer readings ranging from 1.5 to 4.5 tsf. Natural soils in the borings consisted of clays, sandy clays and clayey sands. A layer of sand was encountered in Boring B-6 in a depth range of 8 to 10 feet. The clayey soils were moderately to highly plastic exhibiting liquid limits ranging from 41 to 56 percent and PI's ranging from 24 to 36 percent. The surficial clays are stiff to hard in consistency exhibiting hand penetrometer readings ranging from 1.5 tsf to in excess of 4.5 tsf. The pavement subgrade clays exhibited soluble sulfate contents ranging from 260 to 892 parts per million. 4.2 GROUNDWATER CONDITIONS Groundwater was not encountered in the borings at the time of this investigation. However, it is not possible to accurately predict the magnitude of subsurface water fluctuations that might occur based upon short-term observations. The subsurface water conditions are subject to change with variations in climatic conditions and surface water runoff. 5.0 PAVEMENT RECOMMENDATIONS 5.1 PAVEMENT SECTION The new widened roadway will be about 34 to 37 feet wide with one lane in each direction and a parking or a turning lane. The City of Coppell's standard "Type 0, C-2U" pavement section is planned for the roadway. The planned pavement section consists of 6 inches of Portland cement concrete pavement underlain by a 6-inch lime stabilized subgrade. The pavement concrete will have a 7-day flexural strength of 650 psi. 5.2 PAVEMENT SUBGRADE PREPARATION Cuts and fills of less than 3 feet will be required to develop the pavement vertical alignment. The on-site clays exhibited soluble sulfate contents ranging from 260 to 892 parts per million (PPM). These levels of sulfate content in subgrade soils are not considered to pose a risk to lime induced heave upon lime treatment. Fill soils should consist of on-site clays and sandy clays or their equal having a PI between 10 and 40. Sandy or gravelly soils having a PI of less than 10 should not be allowed within 2 feet PAGE 3 TERRA-MAR DE03-118 of the pavement surface for lime treatment of subgrade soils and in order to provide a uniform pavement support. If on-site soils are not used as fill, the soluble sulfate content of the fill soils should be determined. Pavement subgrade preparation should consist of removing any topsoil, vegetation, and any other deleterious materials from the construction area. The subgrade should then be proofrolled under the observation of the project geotechnical engineer or a representative of the engineer. Proofrolling should be performed prior to placing fill after removing topsoil, vegetation, and any other deleterious materials from the site. Proofrolling can generally be accomplished using a heavy (25 tons or greater total weight) pneumatic tired roller making several passes over the areas. Soft or compressible zones should be removed to a firm subgrade and replaced with compacted fill. The over-excavation backfill should consist of on-site clays and sandy clays compacted to at least 95 percent of the standard Proctor maximum dry density at a moisture content between -1 and +3 percentage points of optimum. 5.3 LIME STABILIZATION Following the recommended pavement subgrade preparation, the pavement subgrade should be lime stabilized. The subgrade should be stabilized with a minimum lime content of 6 percent by dry weight (27 pounds per square yard per 6-inch depth). The lime stabilization may be performed in accordance with Item 4.6 of the North Central Texas Standard Specifications for Public Works and Construction. 5.4 PAVEMENT CONSIDERATIONS The soils at the site are moderately active and differential heave of the pavement section is expected. The pavement service life may be reduced due to water infiltration into subgrade soils through heave induced cracks in the pavement section. This will result in softening and loss of strength of the subgrade soils. A regular maintenance program to seal pavement cracks will help prolong the service life of concrete pavement. The life of the pavement can be increased with proper drainage. The site should be graded to prevent ponding adjacent to curbs and pavement edges. Backfill materials capable of holding water behind the curb should not be permitted. PAGE 4 TERRA-MAR DE03-118 6.0 CONSTRUCTION MONITORING AND TESTING Many problems can be avoided or solved in the field if proper inspection and testing services are provided. It is recommended that pavement subgrade preparation, fill placement and compaction be monitored by experienced geotechnical engineering technicians. Inspection should be performed prior to and during concrete placement procedures. 7.0 LIMITATIONS The professional services, which have been performed, the findings obtained, and the recommendations prepared were accomplished in accordance with currently accepted geotechnical engineering principles and practices. The possibility always exists that the subsurface conditions at the site may vary from what is shown at the boring locations. If there are any unusual conditions differing significantly from those described herein, Terra-Mar, Inc. should be notified to review the effects on the performance of the pavement structure. The recommendations given in this report were prepared exclusively for the use of City of Coppell, Huitt-Zollars, Inc. and their consultants. The information supplied herein is applicable only for the design of the previously described development to be constructed at the project site and should not be used for any other structure, location, or for any other purpose. Further, subsurface conditions can change with passage of time. Recommendations contained herein are not considered applicable for an extended period after the completion date of this report. It is recommended our office be contacted for a review of the contents of this report for construction commencing more than one year after completion of this report. All contractors referring to this geotechnical report should draw their own conclusions regarding excavations, trafficability etc. for bidding purposes. Terra-Mar, Inc. is not responsible for conclusions, opinions or recommendations made by others based on these data. This report is intended to guide preparation of project specifications and should not be used as a substitute for the project specifications. Recommendations provided in this report are based on our understanding of information provided by the Client about characteristics of the project. If the Client notes any deviation from the facts about characteristics of the project, our office should be contacted immediately since this may materially alter the recommendations. PAGE 5 TERRA-MAR DE03-118 We will retain the samples acquired for this project for a period of 30 days subsequent to the submittal date printed on the report. After this period, the samples will be discarded unless otherwise notified by the owner in writing. DE03-118 PAGE 6 TERRA-MAR ILLUSTRA TIONS DE03-118 TERRA-MAR EDINBURGH LANE : " -2 t ~~~l NORTH o 100 200 U""".....- _ I APPROXIMATE SCALE (IN FEET) LEGEND ::- Approximate ~ Boring Location ~ 8-4 PARK LANE I I - ~ MATCH LINE TERRA-MAR Coppell Road Reconstruction Cooper Lane to Sandy Lake Road Coppell, Texas Drawn by AKH Date Revised 06NOV03 ---..- ... ~: L -=. /' " .."....- iJ":rJ:I,- ,// jll;. , ,- /' FIGURE PLAN OF BORINGS 1 Scale Project No. 1 inch = 200 feet DE03-118 (53850) LOG OF BORING B-1 Project: Coppell Road Reconstruction - Coppell, Texas Date: 10/06/2003 Elev.: 494:f: Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: During Drilling Depth to caving when checked: N/A ELEVATlONI OEPTH 111111 492.5 490 4875 485 4825 480 477.5 SOIL SYMBOLS SAMPLER SYMBOLS 81 fiElD TEST DATA DESCRIPTION o --------------------- 7.5 Hard brown to tan sandy CLAY (CL) FILL - Hard tan, gray & brown sandy CLAY wI gravel (CL-SC) --------------------- 2.5 10 12.5 15 17.5 Notes: Completion Depth: 10.0' TERRA-MAR, INC. Project No.: DE03-118 was: Dry was: N/A MC Ll PL PI .200 DD P.PEN UNCON Stroln 111111 II pol III III II 4.5 11 38 16 22 4.5+ 4.5+ 4.5+ 4.5+ FIGURE 2 LOG OF BORING B-2 Project: Coppell Road Reconstruction - Coppell, Texas Project No.: DE03.118 Date: 10/06/2003 Elev.: 514:1: Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: During Drilling was: Dry Depth to caving when checked: N/A was: N/A ElEVATION/ DEPTH (1..11 SOIL SYMBOLS SAMPLER SYMBOLS .. FIELD TEST DATA 512,5 2,5 510 507,5 7,5 505 10 502,5 12,5 500 15 497.5 17,5 Notes: Completion Depth: 10.0' DESCRIPTION --------------------- 9" Concrete Pavement --------------------- FILL - Very stiff dark brown, tan & gray sandy CLAY wI gravel (CL) --------------------- Very stiff brown sandy CLAY (CL) --------------------- Very stiff to hard brown to tan CLAY wi some sand, calcareous nodules & fine gravel (CL-CH) --------------------- Hard tan sandy CLAY wi calcareous nodules (CL) TERRA-MAR, INC. Me II Pl PI .200 DO P.l'EN UNCON Strain " "" "pol III III II 3.25 21 48 20 28 2.5 19 3.75 15 4,5+ 4.5+ FIGURE 3 LOG OF BORING B-3 Project: Coppell Road Reconstruction - Coppell. Texas Project No.: DE03-118 Date: 10/06/2003 Elev.: 514:t Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: During Drilling was: Dry Depth to caving when checked: N/A was: N/A ELEVATION/ DEPTH (ftttl 512.5 510 507.5 505 502.5 500 497.5 SOIL SYMBOLS SAMPLER SYMBOLS & FIELD TEST DATA o DESCRIPTION MC lL PL .ZOO DO P.PEN UNCON SUlin 1\ 1\ 1\ PI '1\ p.f td td 1\ 2.5 7.5 10 12.5 15 17.5 --------------------- FILL - Tan sandy GRAVEL wI clay (GP) --------------------- Stiff dark gray to gray CLAY wI trace to some sand (CL) Z3 47 20 27 2.0 22 1.75 --------------------- 20 2.5 Very stiff tan & light gray CLAY wI trace to some sand (CL) 21 3.0 Notes: Completion Depth: 10.0' FIGURE 4 TERRA-MAR, INC. LOG OF BORING 8-4 Project: Coppell Road Reconstruction - Coppell. Texas Project No.: DE03.118 Date: 10/06/2003 Elev.: 514:1:: Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: During Drilling was: Dry Depth to caving when checked: N/A was: N/A ELEVATION! OEPTH (inti 512.5 510 507.5 505 502.5 500 497.5 SOIL SYMBOlS SAMPLER SYMBOLS "FIELD TEST DATA o DESCRIPTION MC LL PL PI .200 OD P.PEN UNCDN Strain \I \I \I % pof tlf III \I 2.5 7.5 10 12.5 15 175 --------------------- 6" Asphalt Pavement --------------------- FILL - Stiff brown & dark gray sandy CLAY wi gravel (CL-SC) 20 38 15 23 1.5 --------------------- 25 1.75 Stiff to hard tan & gray sandy CLAY (eL) 20 1.5 18 4.5 4.25 Notes: Completion Depth: 10.0' FIGURE 5 TERRA-MAR, INC. LOG OF BORING B-5 Project: Coppell Road Reconstruction - Coppell, Texas Project No.: DE03-118 Date: 10/06/2003 Elev.: 514:t Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: During Drilling was: Dry Depth to caving when checked: N/A was: N/A ElEVATION! OEPTH (Ioetl 512.5 510 507.5 505 502.5 soo 497.5 SOil SYMBOLS SAMPLER SYMBOLS &FIELD TESTOATA 2.5 Notes: Completion Depth: 10.0' 5 7.5 10 12.5 15 17.5 DESCRIPTION --------------------- 7" Concrete Pavement --------------------- Stiff dark gray & brown sandy CLAY (CL) --------------------- Very stiff to hard tan & light gray sandy CLAY wI calcareous nodules & occasional sand seams (CH) --------------------- Tan clayey SAND (SC) TERRA-MAR, INC. Me LL PL PI .2DD DO P.PEN UNCON Strlin ,.,.,. llo pol III tll \I 2.0 20 51 19 32 55 3.0 15 4.5 4.5+ 2.75 FIGURE 6 LOG OF BORING B-6 Project: Coppell Road Reconstruction. Coppell, Texas Date: 10/06/2003 Elev.: 513:t Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: During Drilling Depth to caving when checked: N/A ElEVATION I DEPTH Ifltt) SOIL SYMBOLS SAMPLER SYMBOLS . FIELD TEST OAT A DESCRIPTION o --------------------- 2.5 Tan SAND wI clay seams (SP) 512.5 4.5" Concrete Pavement ------------------- Gray clayey SAND wI sandy clay layers (SC-CL) 510 --------------------- 5 Very stiff tan sandv CLAY wI calcareous nodules (CL) 507.5 7.5 --------------------- 505 10 502.5 12.5 500 15 497.5 17.5 495 Notes: Completion Depth: 10.0' TERRA-MAR, INC. Project No.: DE03.118 was: Dry was: N/A MC Ll PL PI .200 DO P.PEN UNCON Str.in \\\\% % pol III III % 1.75 16 41 17 24 47 3.5 16 4.5 15 2.75 2.5 FIGURE 7 LOG OF BORING B-7 Project: Coppel! Road Reconstruction. Coppell, Texas Project No.: DE03-118 Date: 10/06/2003 Elev.: 515.5:t Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: During Drilling was: Dry Depth to caving when checked: N/A was: N/A ELEVA TIONI DEPTH Ifllt} 515 512.5 510 507.5 505 502.5 500 497.5 SOIL SYMBOLS SAMPLER SYMBOLS 8< FIELD TEST DATA o DESCRIPTION Me LL PL PI .200 DO P.PEN UNCON Strain %%% ,. pol III tlf % 2.5 7.5 10 12.5 15 17.5 --------------------- 4" As~ha.!!.Pavem~L _ _ _ _ _ _ _ _ _ _ _ _ FILL - Tan sandy GRAVEL (GP) --------------------- FILL - Brown, gray & tan CLAY wI sand (CH-CL) --------------------- 14 56 20 36 49 4.5+ Hard tan & gray sandy CLAY wI clayey sand seams (CH) 4.5+ 11 4.5+ 4.5+ Notes: Completion Depth: 10.0' FIGURE 8 TERRA-MAR, INC. LOG OF BORING B-8 Project: Coppell Road Reconstruction - Coppell, Texas Project No.: 01:03-118 Date: 10/06/2003 Elev.: 515:t Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: During Drilling was: Dry Depth to caving when checked: N/A was: N/A ELEVATION/ DEPTH (INti 515 0 512,5 25 510 5 507.5 7,S 50S 10 502,5 12,S 500 15 497,S 17,S SOIL SYMIOLS SAMPLER SYMBOLS & fiELD TEST DATA DESCRIPTION MC LL PL PI ,200 DO P .PEN UNCON Str.i. %%% % pel III ts! % --------------------- 6" Gravel Road Base --------------------- FILL - Tan sandy GRAVEL (GP) --------------------- FILL - Dark gray clayey SAND wI gravel (Se) 12 26 12 14 4.5 --------------------- Hard dark gray sandy CLAY (CL) 12 4,5+ 14 4.5+ --------------------- Hard tan & light gray sandy CLAY (Cl) 4.5+ Notes: Completion Depth: 10.0' FIGURE 9 TERRA-MAR, INC. Symbol Description Strata symbols ~ Fill [2d CLAY, ... . sandy Concrete Pavement GRAVEL, sandy 0 CLAY . Asphaltic Paving ~ SAND, . . . clayey . . . . -'. . [2J SAND ..... . .... . ..... . .... .. GRAVEL KEY TO LOG TERMS & SYMBOLS Symbol Description Soil Samplers I Thin Wall Shelby Tube Notes: 1. Exploratory borings were drilled on dates indicated using truck mounted drilling equipment. 2. Water level observations are noted on boring logs. 3. Results of tests conducted on samples boring logs. Abbreviations used are: DO = natural dry density (pcf) MC = natural moisture content (%) Uncon.= unconfined compression (tsf) P.Pen.= hand penetrometer (tsf) recovered are reported on the LL PL P:I -200 liquid limi t (%) plastic limit (%) plasticity index percent passing #200 4. Rock Cores REC RQD (Recovery) sum of core sample recovered divided by length of run, expressed as percentage. (Rock Quality Designation) sum of core sample recovery 4" or greater in length divided by the run, expressed as percentage. FIGURE 10 TERRA-MAR,INC RESUL TS OF SOLUBLE SULFATE TESTS BORING DEPTH LIQUID LIMIT PLASTICITY INDEX SOLUBLE SULFATE CONTENT (FEET) (%) (%) (PPM*) B-1 3' - 4' NA NA 892 B-2 3' - 4' 48 28 519 B-3 2' - 3' 47 27 267 B-4 l' - 2' 38 23 317 B-5 2' - 3' 51 32 260 B-6 2' - 3' 41 24 854 B-7 3' - 4' 56 36 722 B-8 2' - 3' 26 14 294 * Parts Per Million or mg/kg COPPELL ROAD RECONSTRUCTION RESULTS OF SOLUBLE SULFATE TESTS COOPER IN TO SANDY lAKE RD - COPPEll, TEXAS TMI JOB#: DE03-118 I FIGURE 11 RESULTS OF LIME SERIES 80 70 60 '0 ~50 'E Gl 'E o 040 Gl ... .a I/) '030 ::!! 20 10 o o 2 4 6 8 10 12 Lime Additive (%) I ---- Liquid Limit - Plastic Limit I 40 35 30 ~ 25 "C .E ~20 'u :;::; ~ 15 0: 10 5 o o 2 4 6 Lime Additive (%) 8 10 12 Soil Description: Tan & gray sandy CLAY COPPELL ROAD RECONSTRUCTION COOPER IN TO SANDY lAKE RD - COPPEll, TEXA RESULTS OF PI LIME SERIES BORING: B-7 ; DEPTH: 3'-4' TERRA-MAR, INC. TMI JOB#: DE03-118 11050 Ables Ln - Dallas, Tx 75229 FIGURE 12