DR9002-CS 900613COPPELL PUBLIC WORKS
ENGINEERING DEPARTMENT
MEMORANDUM
DATE:
· TO:
FROM:
RE:
June 13, 1990
Neal McKinney, Police Chief & Wesley Kilcrease, Fire Chief
Larry Davis,.Construction Inspector
Hill Drive Drainage
By City Council action a construction contract has been
awarded to S.Y.B. Construction Company P.O. Box 13614 Arlington,
Texas 76094-0614, Metro 817-261-0226, Res. 817-460-6029 for the
purpose of modifying the storm drain system located in the alley
between Hill Drive (see attached).
The drainage construction will· require closure to all
ingress and egress traffic in the alley from 6/18/90 until the 60
day contract is complete.
A notice will be sent to each residence advising them of
the construction and requesting on-street parking until
construction is complete. (Approximately 60 days). Sanitation
collection will also be affected and the residence will be
requested to place all refuge at the front curb for collection.
If I can be of further assistance,
'Thank you~
Construction Inspector
please let me know.
CLD/kkc
CC:
Steve Goram, Director of Public Works
Howard Pafford, Water Superintendent
Per Birdsall, Street Superintendent
Ben.delaCruz, Engineering Technician
Shohre Daneshmand, Acting City Engineer