Loading...
DR9002-CS 900613COPPELL PUBLIC WORKS ENGINEERING DEPARTMENT MEMORANDUM DATE: · TO: FROM: RE: June 13, 1990 Neal McKinney, Police Chief & Wesley Kilcrease, Fire Chief Larry Davis,.Construction Inspector Hill Drive Drainage By City Council action a construction contract has been awarded to S.Y.B. Construction Company P.O. Box 13614 Arlington, Texas 76094-0614, Metro 817-261-0226, Res. 817-460-6029 for the purpose of modifying the storm drain system located in the alley between Hill Drive (see attached). The drainage construction will· require closure to all ingress and egress traffic in the alley from 6/18/90 until the 60 day contract is complete. A notice will be sent to each residence advising them of the construction and requesting on-street parking until construction is complete. (Approximately 60 days). Sanitation collection will also be affected and the residence will be requested to place all refuge at the front curb for collection. If I can be of further assistance, 'Thank you~ Construction Inspector please let me know. CLD/kkc CC: Steve Goram, Director of Public Works Howard Pafford, Water Superintendent Per Birdsall, Street Superintendent Ben.delaCruz, Engineering Technician Shohre Daneshmand, Acting City Engineer