Loading...
DR9002-CS 900612 (2) ~ The City With A Beauti u June 12, 1990 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Steven Lloyd Cobb 140 Mockingbird Coppell, TX 75019 Dear Mr. Cobb: This notice is to inform you of the completion of the drainage study authorized by City Council concerning the flooding along Hill Drive between Cherrybark Drive and Sandy Lake Road. The study recommended the existing underground storm drain system located in the alley between Hill Drive and Mockingbird be extended and modified. A construction contract has been awarded to SYB Construction Company (office-Metro #817-261-0226, P.O. Box 13614, Arlington, TX, 76094-0614) by City Council action to make the necessary extension and modification. Construction activity is scheduled to begin on Monday, June 18, 1990 with an expected completion date of August 16, 1990. Due to the location of the storm drain system, construction activity will require the closure of the alley between Hill Drive and Mockingbird (see attached) for the duration of the sixty (60) day contract. Alley closure will necessitate alteration of normal vehicle parking and sanitation collection. We respectfully request all vehicle parking be at street curbside adjacent to your property. Arrangements have been made with Texas Waste Management (436-3512) to make sanitation collection at the front curbside on your regular collection date until construction is complete. Your cooperation and understanding is respectfully requested in order to complete the project. If I can be of further assis- tance, please let me know. Thank. yoM Construction Inspector CLD/kkc