Loading...
ST0301-MP080527 Si O~ol ~;; City of Coppell, Texas Tributary G-l LOMR Project Update Meeting 11111 Freese and Nichols ,....: c.".or COPPELL Tuesday, May 27, 2008 AGENDA 10:00 am 1. GOALS a. Today's Meeting: Present results and discuss additional needs b. Project: LOMR submittal to FEMA to reflect recent construction activities i) Short Term (I) Memorandum on Hydraulic Modeling (2) Results for TranSystems and FNI Improvements as Documented ii) Long Term (1) Submit LOMR once Construction is Complete II. PROJECT UPDATE a. DFIRM Protest b. Hydrology (Existing and Fully Developed) c. Downstream Assessment d. Existing Hydraulics e. Proposed Hydraulics III. LOMR FOR TRIBUTARY G-I a. Existing Hydraulics b. Proposed Hydraulics i) Modifications to TranSystems Construction Documents (1) From the end of the gabion channel to Bethel Road the slope is 0.14% opposed to 0.5% as in the plans (2) Overtopping under proposed conditions starting with the 50-year storm event c. Finished Floor Survey Needs IV. ADDITIONAL COORDINATION a. Existing Gabion Channel i) 100-yr WSEL contained in gabion channel ii) Location of local drainage issue adjacent to channel b. Tributary G-I Erosion Concerns i) Over 6 tps downstream of Coppell Road ii) Extend Channel Improvements to Coppell Road c. DFIRM Mapping CLOSE/ADJOURN 11:00 am