Arbor Manors-LR080616
07/08/2008 12:55
9724058023
ALPHA TESTING
PAGE 03/05
ALPRA'" TESTING
2209 Wisconsin Street, Suite 100
Dallas, TelCas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
DAILY FIELD
REPORT
TESTED FOR: John Baker Corporation
C/O Priority Development, LP
Houston, Texas
DATE: 06/16/08
PROJECT:
Arbor Manors
Coppell, T eXals
OUR REPORT NO.: 080332-42
TECHNICIAN: C.P.
WEATHER: Clear
TEMPERATURE RANGE: 75 to 95
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED SITE TO MONITOR ON-GOING WORK AND
PERFORM FIELD TESTING AS REOUESTED,
WHILE ON SITE THE TECHNICIAN OBTAINED 10 SOIL SAMPLES FOR LABORATORY LIME SERIES ANALYSIS.
LOCATIONS AND LABORATORY TEST RESULTS FOR All RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A
SEPARATE REPORT.
CONTRACTOR. WITH RODMAN UTILITIES, WAS INFORMED OF ALL OSSERVA TIONS AND FIELD TEST RESULTS.
AT THE COMPLETION OF THE SCHEDULED TESTING. THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
Respectfully Submitted.
~-
Sampson Chan
ALPHA TESTING, INC.
Ot.~ IAl<1 re!:tJ1l9 8nd !'IlIlQrt. ore lor Ille e..aJo;I"" II.A of IhA ClIen1 rand t/181r ~1!!'1gn'.11Rd 'e~1a on fie III Qllr olftco) orld ~I'I.!II not be rllllf'Qcl\lQlld ~nclIor d101rllJulild a.ccpl wllllelClftII 3pPlOVlII at AI~h8 TIle us. Of
our name ann to... rollUlts mUSl .....-__ our WT1",," 1OpoffN81. Teel reso,II\!; ond n>port! ~ only to''''' ~ lMled 8ncl1or olJ"NAd. onc:t .,~ nol incliC:lIIY~ of IIle qu&tIttH of .PIl8r~ I<:I,"ICI.II ",. <lmi., ~p"~..n<