Loading...
Arbor Manors-LR080616 07/08/2008 12:55 9724058023 ALPHA TESTING PAGE 03/05 ALPRA'" TESTING 2209 Wisconsin Street, Suite 100 Dallas, TelCas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com DAILY FIELD REPORT TESTED FOR: John Baker Corporation C/O Priority Development, LP Houston, Texas DATE: 06/16/08 PROJECT: Arbor Manors Coppell, T eXals OUR REPORT NO.: 080332-42 TECHNICIAN: C.P. WEATHER: Clear TEMPERATURE RANGE: 75 to 95 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REOUESTED, WHILE ON SITE THE TECHNICIAN OBTAINED 10 SOIL SAMPLES FOR LABORATORY LIME SERIES ANALYSIS. LOCATIONS AND LABORATORY TEST RESULTS FOR All RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT. CONTRACTOR. WITH RODMAN UTILITIES, WAS INFORMED OF ALL OSSERVA TIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED TESTING. THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. Respectfully Submitted. ~- Sampson Chan ALPHA TESTING, INC. Ot.~ IAl<1 re!:tJ1l9 8nd !'IlIlQrt. ore lor Ille e..aJo;I"" II.A of IhA ClIen1 rand t/181r ~1!!'1gn'.11Rd 'e~1a on fie III Qllr olftco) orld ~I'I.!II not be rllllf'Qcl\lQlld ~nclIor d101rllJulild a.ccpl wllllelClftII 3pPlOVlII at AI~h8 TIle us. Of our name ann to... rollUlts mUSl .....-__ our WT1",," 1OpoffN81. Teel reso,II\!; ond n>port! ~ only to''''' ~ lMled 8ncl1or olJ"NAd. onc:t .,~ nol incliC:lIIY~ of IIle qu&tIttH of .PIl8r~ I<:I,"ICI.II ",. <lmi., ~p"~..n<