Arbor Manors-LR080619
07/08/2008 12:55
9724058023
ALPHA TESTING
PAGE 04/05
AlPHI~TESTI.1
2209 Wisconsin Street, Suite 100
Dallas, Texas 75229
Geolechnlcall Construction Materials I Environmentsl
~h...ating.com
TESTED FOR: John Baker Corporation
Priority Development, LP
Houston, Tecas
REPORT OF FIELD
COMPACTION TESTS
DATE: 06(19/08
PROJECT:
Arbor Manors
Coppell, Texas
OUR REPORT NO.: 080332-45
TEST DATA:
TEST ~ SOILID OPTIMUM MAXIMUM VS IN PLACE IN !"LACE PERCENT
NO. DATE DEPTH NUMBER MOISTUAE CRV DENSIiY MOISTURE DRY ClEN9fTV COMPACTION COMMENT-
'I(, I'CF ~ PCF
407 06119/08 FG-3.0 2 17.9 106.4 20.9 104 98 1~A
408 06/19108 FG-2.0 2 17.9 106.4 21.8 102 96 1-A
409 06119/08 FG-1.0 2 17.9 106.4 20,7 105 99 1-A
410 06/19/08 FG-5.0 2 17.9 106.4 20.9 104 98 1-A
411 06119/06 FG-4.0 2 17.9 106.4 22.0 102 96 1-A
412 0811 9/08 FG-3.0 2 17.9 106.4 21.9 102 96 '-A
413 06/19/08 FG-2.0 2 17.9 1 Oe.4 21.4 104 97 1~A
TEST LOCATION:
UTILITIES
407 SANITARY SEWER LINE J AT STATION 1+00
408 SANITARY SEWER LINE J AT STATION 1+00
409 SANITARY SEWER LINE J AT STATION 1+00
410 SANITARY SEWER LINE J AT STATION 4+00
411 SANITARY SEWER LINE J AT STATION 4+00
412 SANITARY SEWER LINE J AT STATION 4+00
413 SANITARY SEWER LINE J AT STATION 4+00
1. FILL
2. NATURALSUBGRADE
a. LIME STABILIZED
4. CEMENT TREArED
. A. IN F'LACE PERCENT MOISTURE AND P'e:RCENT COMPACTION c~L Y WITH ~PECIFICA TIONS
8. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICA noNS
C. PERCENT IN PLACE MOISTURe DOES NOT COMPLY WITH SPIECIFICATIONS
D. RETEST
~espectf\.llly Submllted,
~~
Sampson Ctlan
ALPHA TESTING. INC.
Ol~ tVSl """'~ ~1'Id tep_ 81'1l for 1118 _~ u'"" '" 1~ Clienl (anclll1e1r deaigrwAd 1'DCi~1!lI'I18 CIIl file In QIot' dfIce) ~"a .hAIll'lOt tle tepfOllUcec:I andfor<ll8l11bUled e_1ll will> 1;I1!prass; IIppr'CMl1 DI
AlI"HA. i'I1e Ullll DI "" n""'D aM IeIlreeufta mull 111....... cur wl'iltlltl G~ro\I8l. 1eml "",l,llllllll1Cltopom :IIlPIy only to tne eIlII1PIIlIlI ~ ..ndIOr 0bYMlCf. Gild Gre nlllllldlca1it1e Of me quB11lles or
;oppelet'llly iclenticel or almll8r 'poem-"..
~7/08/2008 12:55
972405~3
ALPHA TESTING
PAGE 05/05
AlPHI~TESTIIII
2209 Wisconsin Street. Suite 100
Dallas, Texas 76229
Geotechnical I Construction Material$ I Environmental
www.alphatesting.com
REPORT OF FIELD
COMPACTION TESTS
TESTED FOR:
John Baker Corporation
Priority Development, LP
Houston, Tecas
DATE: 06/19/08
PROJECT:
Arbor Manors
Coppell. Texas
OUR REPORT NO.: Oa0332-45A
TEST DATA:
TeST ~ SOIL. 10 Of'TIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATE DEPTH NUMBER MOISTURE DRY DENSnY M04STURE DRY DENSnY COMPACTION COMMENT"'
% PCF .. PCF
414 06/19/08 FG-1.0 2 17.9 106.4 19.3 105 99 1-A
415 06/1 9/08 FG-6.0 2 17.9 106.4 20.4 105 99 1-A
416 06119/08 FG-5.0 2 17,9 106.4 20.9 104 98 1-A
417 06/19/08 FG-4.0 2 17,9 106.4 21.2 103 97 1-A
418 06/19/08 FG-3.0 2 17.9 106.4 21.9 102 96 1-A
419 06/19/08 FG-2.0 2 17.9 106,4 21.7 102 96 1-A
420 06/19/0B FG-1.0 2 17.9 106.4 20.9 105 98 1-A
TEST LOCATION:
UTILITIES
414 SANITARY SEWER LINE J AT STATION 4+00
415 SANITARY SEWER LINE J AT STATION 7+00
416 SANITARY SEWER LINE J AT STATION 7+00
417 SANITARY SEWER LINE J AT STATION 7+00
418 SANITARY SEWER LINE J AT STATION 7+00
419 SANITARY SEWER LINE J AT STATION 7+00
420 SANITARY SEWER LINE J AT STATION 7+00
1. Fill
2. NAiURALSUeG~AOE
3. LIME STABILIZED
4, CEMENT TREATED
. ~ IN PLACE ~ERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS
B. PERCENT COMf>ACTION OOES NOT COMf>L Y WITH Sf>EC1FICATIONS
C. f>ERCENT IN PLACE MOISTU~e OOI::S NOT COMPLY WITH speCIFICATIONS
D. RETEST
Respectfully Submitted,
~~-~-
Sampson Chan
ALPHA TESTING, INC.
OU1' 1est results sml rellOnS are 1Q! tl1l1 """lulli.., w;c of It-a Cllal'lt (Dnd lheit ~_ reclpier'llB on ~Ie in our c4T1Ce} ~ncl 811811 nol De reprOClUC*lllf1Cl/Qr dIa1rIlMl)I;t elQlPl w1Ih a_lIB eppl'OY8l Of
AlPHA. Tl1rIuoe 01 out rwne ancllell reeu!l& mUll reoelll9 our ,.,.I~~n 8PFfQV'" TDSl rcsuKsllnd raports "pply only to 1M .llI'I'lpleS ~ f!JftdIot~. ;!I'ld tnl'lOl il'ldicllliY8 0/ II'lo quaJHlh~ of
llpIl8renlly ld8nt~1 Dr .Imlll,," spet;im""..