DR9002-CS 890727DeShazo, Starek & Taho, Inc. Engineers · Planners 330 Union Station · Dallas, Texas 75202 · 214/748-6740 July 27. 1989 Re: Hill Drive Drainage Study Dear Mr. Doyle: On Tuesday, July 25, 1989, discuss the referenced study. our meeting. the attendees listed below met to This letter will serve as minutes of ATTENDEES Russell Doyle Larry Davis Shohre Daneshmand Ben de la Cruz Paul Lipscomb David Lucado City of Coppell City of Coppell City of Coppell City of Coppell DeShazo, Starek DeShazo, Starek Tang Tang Russell Doyle reported that the Dept. of Public Works has reviewed the report and has no comments. Paul Lipscomb mentioned that Public Works knowledge of the operation of the drlnage system could be a key factor in the final design of the project. Larry Davis stated that several practical issues (ingress/ egress, garbage collection, etc.) must be addressed in scheduling the construction. 4. The report was reviewed and found to be generally acceptable to the City staff present. 5. The possibility of using curb inlets rather than grate inlets was discussed. We agreed that the curb inlets would work better from a hydraulic and maintenance standpoint; however. we identified several complications associated with their use: (a) A curb would have to be constructed in the areas where the inlets were required. Mr. Russell Doyle, P.E. July 27, 1989 Page 2 o (b) The inlets would have to be spaced between driveways. (c) The grading of the alley would be more complex. It was agreed that Larry Davis and Dave Lucado will meet at the site with the survey notes and discuss the possible use of curb inlets, This meeting will be scheduled for the middle of next week, Larry Davis will ask a representative of Public Works to attend, This is our account of the meeting, If you have any questions or realize any discrepancies, please contact us. A revised schedule is enclosed, Sincerely, David E. Lucado. P,E. Project Manager DEL/np 89112 SCHEDULE HILL DRIVE DRAINAGE IMPROVEMENTS PHASE A July 26, 1989 APRIL )lAY JUNE JULY AUGUST · Kick-off Meeting 4/03/89 · · Preliminary Analysis ~-~>~a~--- · Meeting with City Staff 4/18/89 - · Prepare for Homeowners Meeting ~ · Coordinate with Homeowners ~~~-;~ · Homeowners Mtgs. 6/22/89, 7/6/89 · · · Prepare Report ~ · Submit Draft Report 7/18/89 A · City Review ~ · Meet with City Staff 7/25/89 - · Finalize Report ~ · Meet with City Staff - · Define Scope of Phase ,,B,, ~ · Meet with Homeowners -~ · Begin Phase ,,B,, (Const. Plans) ·