Alexander Ct-CS080723
THE-CITY.OF
COPPELL
July 23,2008
John Hawkins
Mira Mar Development Corp.
6003 Sunderland Drive
Colleyville, TX 76034
RE: Alexander Court
Final Acceptance
Dear Mr. Hawkins:
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. The two-year maintenance bonds and record drawings
have been received. Maturity on the bonds will be two years from the date of this letter.
Maturity on the Erosion Control Bond will also be two years from the date of this letter.
You may notify the MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year
bond period. If any punchlist items are noted at that time, you will be contacted to make
repairs. Thanks for your cooperation.
Sincer, ~ ~
-----
------
La Davis
Con truction Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
255 PARKWAY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673