Loading...
ST9905-CN080708 THE.CITY-OF DEPT: Engineering DATE: July 8,2008 ITEM #: 1 9 AGENDA REQUEST FORM corrELL ~""." .. *.... l' ~ ,- {) ~ ~ & q 1\ 6 . \ o WORK SESSION D CONSENT o REGULAR ITEM TYPE: CONTRACT IBID or PROPOSAL ITEM CAPTION: Consider approval of City of Coppell Change Order #9 to the Bethel Road Project #ST 99-05 in the amount of $120,836.68 as provided for in CIP funds; and authorizing the City Manager to sign and execute any necessary documents. GOAL(S): ~ EXECUTIVE SUMMARY: Approval of the Change Order will provide for retaining walls to preserve existing landscaping and upgraded traffic signal components to provide video detection and improved communication. FINANCIAL COMMENTS: Funds are available in the Street CIP accounts for this change order. staff recommends approval of Change Order #9 to Tiseo Paving for the Bethel Road project. ACTION TAKEN BY COUNCIL: APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve RECOMMENDED ACTION: M - Hunt S - Peters Vote-7-Q . Libby Ball tA 2008.07.15 10:13:43 -05'00' vifd i tfJA 7!J7!O,f I#Change Order for Bethel Rd THE.CITY.OF COPPELL Jf~* . If r ~ e q .t <'\.s . \ t; MEMORANDUM TO: Mayor and City Council FROM: Kenneth M. Griffin, P.E., Director of Engineering/Public Works DATE: July 8, 2008 REF: Consider approval of City of Coppell Change Order #9 to the Bethel Road Project #ST 99-05 with Tiseo Paving, in the amount of $120,836.68 as provided for in CIP funds; and authorizing the City Manager to sign and execute any necessary documents. This change order provides for construction of retaining walls adjacent to two properties along the Bethel Road project, and provides for upgraded components for the traffic signals to be constructed at Royal Lane and Freeport Parkway. Upon completion of the eastbound lanes of Bethel Road it became apparent that to properly grade behind the curb we would need to slope the ground back well into the adjacent private property in front of the CiCi's warehouse at 1080 W. Bethel Road, as well as the two new Duke Realty buildings at 700 and 800 W. Bethel Road. We have negotiated with the contractor to construct retaining walls in these locations in an effort to preserve the landscape and irrigation systems within this area. The proposed retaining walls represent a cost of $84,058.20. The balance of this change order represents an upgrade to the video detection and radio communication at each of the new traffic signals to be constructed at Royal Lane and at Freeport Parkway. The city's traffic department has been working to upgrade our traffic signal network to better monitor and control the timing and sequencing of the flow of traffic throughout the city. Unfortunately, this project was bid before we selected the type of detection and communication equipment we are currently specifying. Making the change at this time will prevent us from expending more money in the future replacing the original equipment. The traffic signal upgrades represent a change of $44,753.48. We are also deleting an item that was inadvertently placed on two previous change orders at a savings of $3,975.00, and eliminating two radios used for traffic signal communications at a savings of $4,000.00. This creates a total change of $120,836.68 to this contract. This change order, in addition to all previous change orders, brings the total contract amount to $7,786,023.73. Staff recommends approval of this change order in the amount of $120,836.68 and will be available to answer any questions at the council meeting. CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Bethel Road I Project # ST 99-05 CONTRACTOR: Tiseo Paving Company OWNER: City ofCoppell CHANGE ORDER NO.: Nine (9) DATE: July 8,2008 Pg 1 of 2 Item Description Quantity Unit ADD: 1. Modular block wall with concrete footing 2. Upgraded pedestrian signals 3. Upgraded video detection at Royal Lane & Freeport Pkwy Traffic signals 4. Provide Red One wireless connectivity Net Increase to Contract Amount 2,278 DEDUCT: 1. 2. Spread spectrum radio Remove Existing 16" valve (added to contract twice) Net Decrease to Contract Amount Total Change to Contract SF 2 1 EA LS 1 LS 2 EA EA Unit Price 36.90 475.00 22,011.00 21,792.48 2,000.00 3,975.00 Total $84,058.20 $950.00 $22,011.00 $21,792.48 $128,811.68 $4,000.00 $3,975.00 $7,975.00 $120,836.68 CHANGE ORDER NO.: Nine (9) DATE: July 8, 2008 Pg 2 of 2 Original contract amount Net increase in contract amount Change Order #1 Net increase in contract amount Change Order #2 Net increase in contract amount Change Order #3 Net increase in contract amount Change Order #4 Net increase in contract amount Change Order #5 Net increase in contract amount Change Order #6 Net increase in contract amount Change Order #7 Net increase in contract amount Change Order #8 Net increase in contract amount Change Order #9 Revised contract amount $7,293,659.00 o $8,000.00 $8,580.00 $14,247.00 $57,767.65 $270,088.40 $12,845.00 o $120,836.68 $7,786,023.73 Original contract time 570 Calendar Days Previously approved additional time Additional time requested for this change Revised Contract time of completion 68 Days 20 Days 694 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. R~~ 4Y Re ommended By ty gmeer to 'l/' g Date /. t'!/ 6 ;/o-z)/ -------..:. . Red One Network Solutions Proposal PROPOSAL SUBMITTED TO: City of Coppell Street Department 816 S. Coppell Rd. Coppell, TX 75019 Phone: 469 576-1108 9139 Grapevine Highway Suite 540-237 North Rlchland Hills, Tx 76180 Phone 972 675.5400 Fax 972 675-2221 Proposal # Date 206563 Wed, 4-9-08 WORK TO BE PERFORMED AT: City of Coppell Street Department 816 S. Coppell Rd. Coppell, TX 75019 FAX: Phone: Date of Plans We hereby propose to furnish the materials and perform the__labor necessary for the comoletion of: Part Number DescriDtion Unit Price Dtv --, - -~"'--- "---,-,,,,,- Total EauiDment R1-2ANVYOJPPOE11HAAO BelAir 200, ARM311b/g, 2x BRM4 R 1-BA2-bat-BN2SH0001 R1-BA-pwr-BNCKG0025 R1-BA2-br-BN2KG0001 R1-24_0mni-8 R1-58_Patch-19 R1-LMR-CA R 1-MountingKit R 1-BA-WAR-BNSS00011 R1-BA-OSS-BNSWO0010 R 1-BA- T AC-BNSS0001 0 R 1-CA T5eCBL R1-LMR400-bulk R 1-L1TNG-ARSTR-N R1-CAT5eLA Battery, BA200 Backup Battery BA200/100 Power Cord 25' Bracket, BA200 Mount bracket 2.4 GHz Omni Antenna 8 dBi (N-F) 5.8 GHz Patch Antenna 19 dBi (N-F) RF N type Cable Assembly Kits Mounting Hardware Kit BelAir 3 Year Limited Hardware Warranty BelAir OS SW Maintenance including Upgrades (3%/year) Unlimited Phone and Email Support (Annual cost) (3%/year) CA T5e cable per foot LMR-400 RF Antenna Cable per foot RF Lightning Arrester (N Type connector) CAT5e Lightning Arrestors $6,208.00 2 I $12,416.00 ! $240.00 2 I $480.00 $80.00 2 $160.00 $180.00 2 $360.00 $110.00 2 $220.00 $100.00 2 $200.00 $35.00 1 $35.00 $27.00 2 $54.00 2 $0.00 $259.71 2 $519.42 $259.71 2 $519.42 $0.30 200 $60.00 $1.25 50 $62.50 $75.00 1 $75.00 $75.00 2 $150.00 $1,500.00 3 $4,500.00 SubTotal $19,811.34 Total with Tax $19,811.34 StaaelConfiaurellnstallation/Post SurvevlAs-Built ReDort Wireless Mesh Install Includes: Stage, configure, mount units, connect power, LAN and RF ~ - -- cables as necessary, perform post install RF survey & As-Built. Materials are guaranteed to be as specified, and the above work to be performed in accordance with the Statement of Work (SoW) submitted for the sum of Payment term: Payment upon completion and Invoicing Local Tax Rate Any alteration or deviation from above specifications involving extra costs, executed upon written or verbal orders, will become an extra charge over and above estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Property owner to carry fire, tornado and other necessary insurance upon above work. Workman's Compensation and General Liability Insurance on above work to be taken out by Red 1. Respectfully submitted Tim Lawson With Red One Network Solutions (Red1) Richland Hills, TX NOTE: This proposal may be withdrawn if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payments will be made as outlined above. Date Signature Name Please sign and return to a Red1 representative or FAX it to 972 675-2221 or scanlemail to Tim.Lawson#Red1ns.com Page 1 of 1 Keith Marvin - Bethel Road - Modular Wall Price From: To: Date: Subject: CC: "Robert Caudill" <rcaudill@TiseoPaving.com> <kmarvin@ci.coppell.tx.us> 5/12/2008 4:30 PM Bethel Road - Modular Wall Price "Robert Caudill" <rcaudill@TiseoPaving.com>, "Lance Smith" <lsmith@TiseoPaving.com> Keith, Here is the price for the Modular Wall. 1. Diamond Pro Modular Block Wall w/concrete footing. 2278 Face Feet@ $36.90 = $84,058.20 1 A. Diamond Pro Modular Block Wall w/aggregate footing. 2278 Face Feet@ $30.75 = $70,048.50 Tiseo Paving is requesting 20 working days for this work. We need a answer as soon as you can so to lock in the prices of the material. Robert Caudill Vice President Tiseo Paving Company (972) 289-0723 file://C:\Documents and Settings\kmarvin\Local Settings\ Temp\XPGrp Wise\482870A2Cit... 6/19/2008 Page 1 of 1 Keith Marvin - Bethel Road - Traffic Signals From: To: Date: Sub.ject: CC: "Robert Caudill" <rcaudill@TiseoPaving.com> <kmarvin@ci.coppell.tx.us> 6/9/2008 7:58 AM Bethel Road - Traffic Signals "Robert Caudill" <rcaudill@TiseoPaving.com>, "Lance Smith" <lsmith@TiseoPaving.com> Keith; Below are the extra costs for additional signal work. 1. Pedestrian Signals - Countdown pedestrian signal heads for Freeport Parkway. 2 Each @ $475.00/EA = $950.00 2. Video Detection System - Our original bid was for Rack Vision Video Detection. At the time of the project bid, Terra System did not exist. If the City prefer the Terra System, there will be an additional cost. Royal Lane - $12,575.00 and for Freeport - $12,450.00 3. Spread Spectrum Radio - Our original bid was on MDS radio system. The City has requested the Bellaire BA200 radio, supplied by RED One Network Solutions. After multiple unsuccessful attempts to secure pricing from RED One Network Solutions, we required that the radios be deleted from our contract. There will be a credit of $2,000.00 per each intersection. 4. Poles & Mast Arms - The City has approved the paint samples. 5. Confirmation Light - The City has agreed that LED Confirmation Lights are not available at this time and will accept the incandescent type.6 Should you have any questions, please do not hesitate to call. Robert Caudill Vice President Tiseo Paving Company (972) 289-0723 file:/ /C: \Documents and Settings\kmarvin \Local Settings\ T emp\XPGrp Wise\484CE2ABCi... 6/19/2008