Loading...
DR9002-CS 890426DeShazo, Starek & Tang~ Inc. Engineers · Planners 330 Union StatiOn · Dallas, Texas 75202 · 214/748-6740 April 26, 1989 Mr, Russell Doyle, P.E. City Engineer City of Coppell 255 Park Blvd. Coppell, Texas 75019 Re: Proposal - Phase B, and Vicinity Drainage Improvements, lU, 1 Hill Drive Dear Mr. Doyle: As you requested, we are sending a proposal for Phase B services for the project. Two copies are enclosed. Please do not hesitate to contact either me or David Lucado if there are any questions. We look forward to working with you on this project. Sincerely, Paul A. Lipscomb. P.E. Vice President PAL/np encl 89112 DeShazo, Starek & Tang, Inc. Engineers · Planners 330 Union Station · Dallas, Texas 75202 · 214/748-6740 Aprll 26, 1989 Mr. Alan Ratliff City Manager City of Coppell 255 Park Blvd. Coppell, Texas 75019 Re: Proposal - Phase B, Drainage Improvements, and Vicinity lU,1 Hill Drive Dear Mr. Ratliff: In accordance with our discussions with Mr. Russell Doyle, City Engineer, we have prepared this proposal for preparing final design and construction documents for drainage improvements for the project. The final design, or Phase B, will be as directed by the City following their review of the analysis and recommendations presented in Phase B. Two copies of this proposal are enclosed. We propose to include the following services: A. Design Surveying. B. Preparation of construction plans and specifications. The cost of these services will be on a reimbursable basis and will not exceed $6,500 without prior authorization. Construction staking, estimated at $2,000, would be an Additional Service. A summary of our estimated construction and consulting engineering costs, dated February 13, 1989, is attached. It is our understanding that the City will provide all Bidding and Construction Administration services. Mr. Alan Ratliff April 26. 1989 Page 2 We certainly appreciate this opportunity to provide engineering services to the City. If this proposal meets with your approval, please execute both copies and return one to us. If there are any questions, please contact either me or David E. Lucado, Project Manager. Sincerely, Paul A. Lipscomb, P.E. Vice President PAL/np encl 89112 ACCEPTED: CITY OF COPPELL By: Title: Date: