Loading...
CiCi's Addition-CS080731 THE.CITY.OF COPPELL July 31, 2008 C. Jack Evans, P.E. Pacheco Koch Consulting Engineers, Inc. 8350 North Central Expressway, Suite 1000 PIano, TX 75093 RE: CiCi's Warehouse Expansion Dear Mr. Jaffe: The City of Coppell has reviewed the revised plans for the referenced addition and the plans will be approved once following comments have been addressed: General 1. Many of the notes and listed materials are incorrect. Refer to the City of Coppell Subdivision Ordinance and Engineering Construction Details regarding the Grading and Drainage, Water and Sewer, and Paving Plans. Plat 2. The Plat will need to be provided in order for us to review its content. Cover Sheet 3. Correct misspelled words. 4. Include the Title Block with the Mayor and City Council Members. Grading and Drainage Plan 5. The material for the storm drains lines must be RCP. Water and Sewer Plan 6. Change the 90 degree bend to a 45 degree bend on the 8" water line. Paving Plan 7. Refer to our Construction Standard Details for tie-in to existing pavement. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, A1I~t. ~ Di Wanna Baskins Graduate Engineer Office Phone: (972) 304-3562 Fax: (972) 304-3570 2