Loading...
Kountry Donuts-LR080801 Rone Engineering . Client: Mrs. Shawna Kim 1403 Savoy Ct Colleyville, TX 76034 ~ 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 326511 Project No.: 0814449 Date of Service: 07/03/2008 Report Date: 08/01/2008 Project: 'Kountry Donuts Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Cooper General Contractors Concrete Supplier: Nelson Brothers Plant: 1 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: PD35 Placement Date: 07/03/2008 Weather Conditions: Partly cloudy Time Sampled: 12:40pm Batch time: 11 :51 am Temperature - Air: 900F Concrete: 900F Truck No: 111 Ticket No: 102779 Air Content: 1.3% Unit Weight (pet): NA Overall Placement Location: Paving, parking lot north section Measured Slump (inches) 5.0 Sample Location: North parking lot 30' north, 10' east of northwest corner of building slab REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 07/10/2008 7 6.00 28.27 94,350 3,340 Type2 2 07/31/2008 28 5.99 28.18 106,680 3,790 Type3 3 07/31/2008 28 5.99 28.18 109,250 ~ Type2 Average ,830 1 4 08/28/2008 56 ~~ [g]~ [ill LS] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 .. rllCY LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full wijhout the written approval of Rone Engineering Services. Ltd. (GD/eL) Page 1 of 3 Rone EnQ.ineering -- 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Mrs. Shawna Kim 1403 Savoy Ct Colleyville, TX 76034 <~ .;- ? " Report of Concrete Compressive Strength Test 326511 Project No.: 0814449 Date of Service: 07/03/2008 Report Date: 08/01/2008 Report No.: Project: /" K 'try Donuts -appell, Texas btain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring amples back to the laboratory for curing and testing in accordance with applicable standards. .--/ Services: Remarks: Water added at site: 20 gallons LIMITATIONS: The test resu~s presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (GO/eL) Page 2 of 3 Rone En=== Client: Mrs. Shawna Kim 1403 Savoy Ct Colleyville, TX 76034 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 326511 Project No.: 0814449 Date of Service: 07/03/2008 Report Date: 08/01/2008 Project: Contractor: Cooper General Contractors Concrete Supplier: Nelson Brothers Plant: 1 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: PD35 Placement Date: 07/03/2008 Weather Conditions: Partly cloudy Time Sampled: 03:25pm Batch time: 02:55pm Temperature - Air: 900F Concrete: 900F Truck No: 111 Ticket No: 2 Air Content: 1.7% Unit Wei p Overall Placement Location: Paving, parking lot north section Measured Slump (inches) 5.0 1'" e Sample Location: North parking lot 35' east, 5' north of northeast cor er of building sl " '~ t; '1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 07/10/2008 7 6.00 28.27 91,470 3,240 Type5 2 2 07/31/2008 28 5.99 28.18 104,280 3,700 Type2 2 3 07/31/2008 28 5.99 28.18 114,410 C Type2 Average ,880 2 4 08/28/2008 56 0t:J ~Q] 5l] 5] DCl D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Finished: 04:15pm Technician: Pat Parks Started: 12:30pm Report Distribution: Orig: Mrs. Shawna Kim (Colleyville, TX) (1-cc copy) 1-ec Cooper General Contractors AUn: Mr. Bill Cawley 1-ec Rone Project Manager AUn: Mr. Gary Dry 1-ec City of Coppell Alln: Mr. Larry Davis 1-ec City of Coppell Alln: Mr. Lee Stone Rone Engineering ~ '0. U \ Gary Dry SET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (GD/eL) Page 3 of 3