Loading...
DR9303-CS 970203 ~ Coppell, Texas 75019 ~"'~ -~ "The City With A Beautiful Future February 3, 1997 Picky $. Main, Presidem M-Co Construction, Inc. 6816 Harmonson Road North Richland Hills, TX 76180 RE: Moore Road Drainage Improvement Project DR 93-03 Dear Mr. Main: The City of Coppell Engineering Departmem has made a f'mal walk thru of the referenced facilities. Listed below are items that should be addressed prior to final acceptance. 1. Repair tie-in at existing culvert and 6' x 4' box. 2. Pour inverts and dress up junction boxes. 3. Replace traffic buttons on Moore Road. 4. Replace shrubs at apartments and secure letter of approval from apartmem manager. 5. Submit "as built" plans. Thank you for your cooperation during this construction and if I can be of further assistance please call me at (972)304-3685. Sincerely, Construction Inspector