Loading...
Bellacere Addn-CS080820 ~ Serving The Geo-Industry Since 1974 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910. FAX: (972) 790-0967 * Geotechnical Materials ~ Failure Testing y,nvestigation Environmental SAM ENGINEERING & TESTING, L.P. August 20, 2008 City Of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Attention: Ms. DiWanna Baskin, Graduate Engineer Engineering Department Subject: ADDENDUM-Letter on Proposed Pavement Section Proposed Four Residences & Pavement At Lots 1-4 &':lX,:Block-A 1.96 Acre Site, Bellacere Addition -300 West Sandy Lake 'Road "Coppell , Da1Ias-" County ~ Texas SE&T Soil No: 169GX4K8 Dated 5-14-2008 SE&T Current Project No: 334EX4K8 Madam: SAM Engineering & Testing, L.P. (SE&T) is pleased to submit this addendum letter on the proposed pavement section at the subject site. 1. Background SE&T performed the seven soil test borings soil report for the subject project (SE&T #169GX4K8 dated 5-14-2008) containing our recommendations on selection, designs & construction of the proposed four residences & pavement. 2. Paving plan #C30 by Hamilton-Duffy and e-mail by Mr. Tommy Cansler showed the proposed pavement section Gomprising of the following minimum thicknesses from the-surface down: 8 em. (3. 15 " ) 0.75"-1" 5" 6" thick pavestone pavers. thick sand base. thick 3600 psi concrete with #3 rebars @ 18" a/c. thick subgrade compacted to 95% of ASTM D698A. City Of Coppell SE&T Project No. 334EX4K8 August 20, 2008 Page 2 of 2 Geotechnical Materials ~ Failure Testing Vlnvestigation Environmental 3. Based on the above supplied section, our above subsurface data & our experience with similar projects, SE&T recommends that the above proposed pavement is considered SATISFACTORY with the following modifications/adjustments: The concrete to be a 4,000 psi/28 days (6 sack minimum). The upper 12" of the sugrade under the pavement should be compacted & tested to a minimum of 95 % of ASTM D-698A. SE&T should perform all CMT testing & inspections. 4. All other listed recommendations in our above soil report should be followed. It has been a pleasure serving you on this project and we trust that this report is satisfactory. Should you desire any additional services pursuant to this report, either in additional consultations or construction testing, please do not hesitate to contact us. ~~~ ;,),~\\, .\~ , Very truly yours, SAM Engineering & Testing, L.P. Sadik (Sam) Al-musawe, M.Sc., Ph.D., P.E., F.ASCE, Civil & Environmental Engineer Texas Professional Registration No: 61893 2-10 Home Buyers Warranty (HBW) No. 8827 Home of Texas/Residential Warranty Corporation (RWC) No. 633 Bonded Builders Home Warranty No. TXG025 cc. Mr. Tom F. Whatley, President-Heritage Development Mr. Micha P. Duffy, P.E.-Hamilton-Duffy Mr. Tommy Cansler-Timberland Creek Companies