Loading...
Bethel BP-CS080624 THE.CITY.OF COPPELL l' June 24, 2008 Daniel M. Goodwin, P.E. Goodwin & Marshall, Inc. 2405 Mustang Drive Grapevine, TX 76051 FAX: 817/329-4453 RE: Bethel Business Park, Lot 1 Block A Final Walk -thru Dear Mr. Goodwin: Please be advised that a walk-through has been scheduled for Friday, June 27,2008 at 8:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor I s representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-7090 at your earliest convenience. Sincerely, 1UChD(~~J1J. Rick O'Dell ! t;--- - Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Fire Marshal Ted O'Neal, McFadden & Miller, FX: 972-401-1399 255 PARKWAY * P,O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673