Stringfellow 9A-CS080903
THE.CITY.OF
COPPELL
.,
,-
September 3,2008
Daniel Heischman
Dowdey, Anderson & Associates, Inc.
5225 Village Creek Drive, Suite 200
PIano. Texas 75093
RE: Stringfellow Addn/Lot 9 Block A (Vision Center)
Construction Plan Review Comments
Dear Mr. Heischman:
The City of Coppell has reviewed the referenced plans and has the following comments to
offer:
General Comments -
1. The asphalt paving on Holly Street will be overlaid. Any damage to Holly Street as
a result of Lot 9 Block A construction will be the owner's responsibility.
2. Show Construction Entrance on Erosion Control Plan
Title Page -
3. Include Stringfellow Addition in title.
Plat -
4. Include the 20 foot drainage easement on the plat.
Pavin~ & Grading Plan -
5. The compressive strength of the concrete pavement and subgrade should be 3600
psi, per NCTCOG standards.
6. If the sub grade will not be lime stabilized, a letter requesting a waiver must
accompany a geotechnical report.
Drainage Area Plan -
7. Show how water will drain from the property into the existing storm drain. Should
an inlet be used to tie into existing storm drain?
Utility Plan -
8. Will irrigation be necessary for vegetation? If so, the meter will need to be shown
on the utility plan.
9. The water meter needs to be shown on the plan.
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
2
Erosion Control Plan-
10. All inlets, including the existing 4' x 4' drop inlet, must be shown on the plan to be
protected by some form of an erosion control device.
Please make the requested changes and submit these marked-up plans and two sets of
revised plans to the City for additional review. If you have any questions, please contact
this office at your convenience.
Sincerely,
/ 1/ j/ ,"
, 1Ji/ r :fAC tLA rl~) ACt \.oj
Di Wanna Baskins
Graduate Engineer
Office Phone: (972) 304-3562
Fax: (972) 304-3570