Loading...
DR9002-CS 890215~0 Union Station [] One Memorial Place Ste. 375 [] 208 West 4th Street Dallas, Texas 75202 7633 £. 63rd. Place Austin, Texas 78701 Tulsa, Oklahoma 74133 ~ (512) 472-4214 Metro--263-5428 n Sundance Square ~,/~ ]/]~_~.'.'.'.'.'.'.'.'.~- }'~ ]~ ~"2.,.~__ 120 West Third Street, Suit~.~// ~'~U I t/~'~l~"~ /:/ LETTER OF TRANSMITTAL ~ DATE: I~OM: WE ARE ENCLOSING: No Copies Description / H~oA,, b~/~ ~. P~ ~" / For Your Use For Your Approval ,/ As Requested Approved as Noted REMARKS: COPY TO: PROBABLE ENGINEERING COSTS HILL STREET DRAINAGE PHASE A SURVEY SERVICES Crew 16 hrs. x $70 : $1,120 Survey Director 4 hrs. x $60 : $240 Reduce/Plo~ 12 hrs. x $50 = $600 Expenses $150 SUBTOTAL $2,110 Feb. 13, 1989 ENGINEERING SERVICES Meetings Principal 2 hrs. x $100 = $200 Director 3 hrs. x $80 = $240 Proposal Evaluation Principal i hrs. x $100 : $100 Director 6.5 hrs. x $80 = $520 Survey Oir. 1.5 hrs. x $60 : $90 Project Engr. 3.5 hrs. x $50 : $175 Report Generation Principal 3 hrs. x $100 : $300 Director 10 hrs. x $80 = $800 Project Engr. 15 hrs. x $50 : $750 Tech/Draft 8 hrs. x $40 = $320 Expenses $195 SUBTOTAL $3,690 TOTAL $5,800 PROBABLE ENGINEERING AND CONSTRUCTION COSTS HILL STREET DRAINAGE PHASE B Feb. 13, 1989 Unit Description Unit Price Quantity Remove Ex. Pavement S.Y. $10 800 8" 3000 psi Pavement S.Y. $25 800 Remove ~xisting Inlet L.S. $1,000 1 New 6' Inlet Each $2,500 1 Saw Cut L.F. $2 300 Unclassified Excavation C.Y. $10 300 SUBTOTAL Amount Total $8,000 $2o,ooo $1,000 $2,500 $600 $3,000 $35,1oo 20% CONTINGENCIES TOTAL $7,020 Plans & Contract documents, Complete Topo Survey Staking* TOTAL $42,120 $6,500 $2,000 $50,620 * Bidding and Construction Administration by City of Coppell