Loading...
ST9905-LR080630 REPORT OF SOIL-LIME MIXTURE PULVERIZATION llre'rra:can C::onslilll"a I:n"lne.... Ii'. Scientists 8901 Carpenter FIWY., Suite #100 Dallas, Texas 75247 (214-630-1010 Date of Service: 06/30/08 Client No.: 18390 Client: City of Coppell TX Engineering Dept PO Box 9478 Coppell, TX 75019 Report No.: 94081124.0042 Project No.: 94081124 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Contractor: TISEO Test Location: Bethel Road Specification Requirements: Minimum Passing 1-3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Test Method: NCTCOG TEST LOCATION 1-3/4" SIEVE #4 SIEVE NO. % PASSING % PASSING 1 Sta. 32+00 100 69 2 Sta. 35+00 100 72 3 Sta. 38+00 100 70 4 Sta. 41 +00 100 69 Comments: Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Technician: A. Rendon Eric 1. . lev land, P .E. Senior Project Engineer dgr This report is exclusively for the ~e of the client indicated above and shall not be reproduced in full without written approval ofTerracon.