Loading...
ST9905-LR080616 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0025 Service Date: May 16, 2006 lrerracan 8901 Carpenter F'fW'/, ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 12:08pm Plant: 7 Supplier: Lattimore Materials Truck No: 9115 Ticket No: 7192488 Mix I.D. No.: 1701 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,DF: Plastic Unit Weight, pet: Report Date: June 16, 2006 Project: Bethel Road I - #5T 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94061124 Samole Information Date Cast: May 16,2006 Time: 1:15pm Sampled by: Ira S. Haynes Weather Conditions: Clear Accumulative Yards: 40 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 5+50 Placement Location: Box culvert base Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppel! TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Result 4.50 2.3 81 74 152.4 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) OS/23/2008 7 97,270 3,440 06/13/2008 28 125,790 4,450 06/13/2008 28 122,460 4,330 Average (28 Days) 4,390 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 1 1 1 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Reviewed by: Terracon Rep: Ira S. Haynes rlc . CI la d, P.E. Senior Project nglneer The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except In fuli without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 1 of 1 OI~01--FuluteKey REPORT OF SOil-LIME MIXTURE PULVERIZATION lrerracan Consultlna Enalneers & SClenllsts 8901 Carpenler Frwy., Suite #100 Dallas. Texas 75247 (214.630-1010 Date of Service: 06/16/08 Client No.: 18390 Client: City of Coppell TX Engineering Dept PO Box 9478 Coppell, TX 75019 Report No.: 94081124.0031 Project No.: 94081124 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Contractor: Test Location: E Bound, Bethel Rd. Sta. 0+00 - Sta. 9+50 Specification Requirements: Minimum Passing 1-3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Test Method: NCTCOG TEST LOCATION 1-3/4" SIEVE #4 SIEVE NO. % PASSING % PASSING 1 Sta. 0+50, 30' right of center line 100 80 2 Sta. 5+00, 10' right of center line 100 75 3 Sta. 8+00, 10' right of center line 100 76 Comments: Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Technician: B. Hatch Eric 1. Cleveland, P .E. Senior Project Engineer dgr This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval ofTemean.