Loading...
DR9303-CS 960617 ~' ~-- ~ ..... '.0. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 June 17, 1996 Ricky J. Main, President M-Co Construction, Inc. 6816 Harmonson Road North Richland Hills, TX 76180 RE: Moore Road Drainage Improvement Project DR 93-03 Dear Mr. Main: At the June 11, 1996 City Council meeting, the City Council awarded the referenced project to your firm. Enclosed with his letter are three copies of the contract signed by the Mayor. Please sign the three copies, provide the required bonds and return two of the copies to the Engineering Department. One of the copies is for your record. Once the contracts have been signed and returned to our office, a preconstruction meeting will be scheduled and a notice to proceed letter will be issued. Also, included with this letter is a signed copy of the temporary construction easemem to allow work within the existing lake. The inspector on this project will be Garreth Campbell. If you should have questions concerning this project please feel free to contact Garreth or myself at 304-3679. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Garreth Campbell, Construction Inspector