Loading...
Minyard Site-LR080501 REED EnGinEERinG GEOTECHNICAL AND G R Cl LI F' ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Freeport Crossing Freeport Parkway and Bethel Road Coppell, Texas REPORTED TO: KTR Coppell, LLC c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 A TIN: Mr. Roger Dahlin REPORT NO. 27 REPORT DATE: 05-01-08 REG PROJECT NO. 15324 TECHNICIAN: K. McAdams PAGE: 1 of 1 CONTRACTOR: C.F. Jordan On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Injection Depth ft 10 100-200 12-18 Date 05-01-08 05-02-08 05-03-08 E ui Number of Probes ea 4 ment Length of Probes ft 12 Probe Spacing ft 5 Pass No. 2 2&3 3 Surfactant added at regular intervals: Yes E-Mail Distribution: (1) Pritchard Associatesl Mr. Roger Dahlin (1) Pritchard Associatesl Ms. Rhonda Hargrove (1) City of Coppell/Ms. Carol Dye Submitted by: REED ENGINEERING GROUP, LTD. ~ W4.,c~ Mail Distribution: (1) KTR CoppeIl/LLC/Mr. Matthew Taylor (1) City of Coppell/Mr. Lee Stone (1) O'Brien & Associatesl Mr. Richard Nordyke (1) Technistructures, Inc.l Mr. Dennis Gant (1) C.F. Jordan/Mr. Steve Lawrence Bill Woolwine Sr. Manager, CMT BW/ds 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 350 5600 . fAX [214] 3500019