Minyard Site-LR080501
REED EnGinEERinG
GEOTECHNICAL AND G R Cl LI F'
ENVIRONMENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Freeport Crossing
Freeport Parkway and Bethel Road
Coppell, Texas
REPORTED TO: KTR Coppell, LLC
c/o Pritchard Associates
2500 Routh Street
Dallas, Texas 75201
A TIN: Mr. Roger Dahlin
REPORT NO. 27
REPORT DATE: 05-01-08
REG PROJECT NO. 15324
TECHNICIAN: K. McAdams
PAGE: 1 of 1
CONTRACTOR: C.F. Jordan
On these dates a representative of Reed Engineering Group, Ltd. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Injection Depth
ft
10
100-200
12-18
Date
05-01-08
05-02-08
05-03-08
E ui
Number of Probes
ea
4
ment
Length of Probes
ft
12
Probe Spacing
ft
5
Pass No.
2
2&3
3
Surfactant added at regular intervals:
Yes
E-Mail
Distribution: (1) Pritchard Associatesl
Mr. Roger Dahlin
(1) Pritchard Associatesl
Ms. Rhonda Hargrove
(1) City of Coppell/Ms. Carol Dye
Submitted by:
REED ENGINEERING GROUP, LTD.
~ W4.,c~
Mail
Distribution: (1) KTR CoppeIl/LLC/Mr. Matthew Taylor
(1) City of Coppell/Mr. Lee Stone
(1) O'Brien & Associatesl
Mr. Richard Nordyke
(1) Technistructures, Inc.l
Mr. Dennis Gant
(1) C.F. Jordan/Mr. Steve Lawrence
Bill Woolwine
Sr. Manager, CMT
BW/ds
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 350 5600 . fAX [214] 3500019