Loading...
Minyard Site-LR080414 REED EnGinEERinG GEOTECHNICAL AND G R CI LJ P ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Freeport Crossing Freeport Parkway and Bethel Road Coppell, Texas REPORTED TO: KTR Coppell, LLC c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 A TTN: Mr. Roger Dahlin CONTRACTOR: C.F. Jordan Proctor No. 1 2 3 4 ASTM Standard 0-698 0-698 0-698 0-698 REPORT NO. 7 REPORT DATE: 04-14-08 REG PROJECT NO. 15324 TECHNICIAN: D. Gazley PAGE: 1 of 2 Descri tion Brown & yellow sandy clay Brown & yellow clay Oark brown clay Yellowish brown cia w/calcareous nodules Test No. Date Location 41 03-25-08 Paving: 80'S, 30'W(1) 42 Paving: 85'S, 160'W(1) 43 03-26-08 Paving: 350'S, 70'E(2) 44 Paving: 11 O'S, 115'E(2) 45 Paving: 200'S, 80'E(2) 46 Paving: 260'S, 100'E(2) 47 Paving: 300'S, 90'E(2) 48 Bldg Pad C: Line 0-1.2 49 Bldg Pad C: Line 0.1-3.3 50 Bldg Pad C: Line 0.3-4.2 51 Bldg Pad C: Line D-6 52 Bldg Pad C: Line 0.2-7.9 53 Bldg Pad C: Line 0.1-9.8 54 Bldg Pad C: Line D-11.1 55 Bldg Pad C: Line 0.2-12.4 56 03-27-08 Bldg Pad C: Line 5.8-A.5 57 Bldg Pad C: Line 4.5-A.5 58 Bldg Pad C: Line 2.5-A.5 59 Bldg Pad C: Line 1.2-A.2 60 Bldg Pad C: Line 1.2-C 61 Bldg Pad C: Line 3-C 62 Bldg Pad C: Line 4.2-C 63 Bldg Pad C: Line 6.1-C 64 Bid Pad C: Line 7.6-C Depth Below Final S. G. feet 3.0 3.0 1.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Field Density c 86.8 90.9 99.5 94.4 99.2 98.7 99.4 101.7 92.2 96.0 92.3 94.8 93.3 95.2 94.7 88.1 92.1 93.4 97.0 92.2 94.5 102.5 102.8 103.7 Field Moisture % 30.5 28.9 23.6 25.3 24.1 23.4 22.1 21.3 25.9 24.8 25.5 24.8 25.1 24.9 24.9 30.9 26.7 26.2 25.2 26.0 26.0 21.8 20.0 19.8 Optimum Moisture, % 19.9 17.6 22.8 28.7 Proctor 10 4 4 1 3 1 1 1 2 3 3 3 3 3 3 3 4 3 3 1 3 3 2 2 2 Compaction Level % 95.1 99.6 96.0 95.4 95.8 95.3 95.9 95.0 93.1 97.0 93.2 95.8 94.2 96.2 95.7 96.5 93.0 94.3 93.6 93.1 95.5 95.8 96.1 96.9 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214J 3505600 . FAX [214] 3500019 REPORT NO. 7 REPORT DATE: 04-14-08 REG PROJECT NO. 15324 PAGE: 2 of 2 Test No. Date Location 65 03-27 -08 Bldg Pad C: Line 9-C 66 Bldg Pad C: Line 10.5-C 67 Bldg Pad C: Line 12.2-C 68 Bldg Pad C: Line 10-A.5 69 Bldg Pad C: Line 11.7-A.5 70 Bid Pad C: Line 12.5-A.5 Depth Below Final S. G. feet 3.0 3.0 3.0 3.0 3.0 3.0 Field Density c 92.5 93.8 103.8 87.8 95.5 96.0 Proctor ID 3 3 2 4 1 1 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from S.W. corner of Building C. (2) Measurements referenced from N.E. corner of Building A. Mail Distribution: (1) KTR CoppeIl/LLC/Mr. Matthew Taylor (1) City of Coppell/Mr. Lee Stone (1) O'Brien & Associatesl Mr. Richard Nordyke (1) Technistructures, Inc.l Mr. Dennis Gant (1) C.F. Jordan/Mr. Steve Lawrence E-Mail Distribution: (1) Pritchard Associatesl Mr. Roger Dahlin (1) Pritchard Associatesl Ms. Rhonda Hargrove (1) City of Coppell/Ms. Carol Dye Submitted by: Compaction Level % 93.4 94.7 97.0 96.2 92.2 92.7 REED ENGINEERING GROUP, LTD. ~ iJ4.,c~ Bill Woolwine Sr. Manager, CMT BW/ds