Loading...
Vista Point 2R-LR070606 REED EnGinEERinG GEOTECHNICAL AND G R CJ U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Cappel!, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 124 REPORT DATE: 06-14-07 REG PROJECT NO. 13581 DATE OBSERVED: 06-06-07 TECHNICIAN: D. Balderas PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Building 6 north and east sidewalk. I Reference Plans or Notes Used: I Sheet A 1.04 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Companyl Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214] 3505600 . FAX [214] 3500019 REED EnGinEERinG GEOTECHNICAL AND G R 0 LJ F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 125 REG PROJECT NO. 13581 SAMPLE DATE: 06-06-07 TECHNICIAN: D. Balderas PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. - Location of Sam Ie Set Number Location 1 Sidewalk: 1 O'E from NW corner of Bid Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Desi n Information Source of Concrete Redi-Mix Mix Identification 330J 15D4 ecified Stren 3000 Date Tested 06-13-07 07 -04-07 07 -04-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 69660 106230 103530 3710 Air Entrainment 3.3 Ticket Number 59008247 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MUlnc Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REED EnGinEERinG GEOTECHNICAL AND G R CJ U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 125 REG PROJECT NO. 13581 SAMPLE DATE: 06-06-07 TECHNICIAN: D. Balderas PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Sidewalk: 1 O'E from NW corner of Bid Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Mix Identification 330J15D4 ecified Stren 3000 Date Tested 06-13-07 07-04-07 07-04-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 69660 Air Entrainment 3.3 Ticket Number 59008247 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MUlnc Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin .,,~- 'DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214J 3505600 . FAX [214J 3500019