Vista Point 2R-LR070606
REED EnGinEERinG
GEOTECHNICAL AND G R CJ U P
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Cappel!, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 124
REPORT DATE: 06-14-07
REG PROJECT NO. 13581
DATE OBSERVED: 06-06-07
TECHNICIAN: D. Balderas
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
I Items Observed:
I Building 6 north and east sidewalk.
I Reference Plans or Notes Used: I Sheet A 1.04
x IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Extranet
Distribution: (1) Jackson Shaw Companyl
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Ronald F. Reed, P.E.
BW/rs
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214] 3505600 . FAX [214] 3500019
REED EnGinEERinG
GEOTECHNICAL AND G R 0 LJ F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 125
REG PROJECT NO. 13581
SAMPLE DATE: 06-06-07
TECHNICIAN: D. Balderas
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
-
Location of Sam Ie
Set Number Location
1 Sidewalk: 1 O'E from NW corner of Bid
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Desi n Information
Source of Concrete
Redi-Mix
Mix Identification
330J 15D4
ecified Stren
3000
Date Tested
06-13-07
07 -04-07
07 -04-07
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
69660
106230
103530
3710
Air
Entrainment
3.3
Ticket
Number
59008247
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MUlnc
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019
REED EnGinEERinG
GEOTECHNICAL AND G R CJ U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 125
REG PROJECT NO. 13581
SAMPLE DATE: 06-06-07
TECHNICIAN: D. Balderas
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Location of Sam Ie
Set Number Location
1 Sidewalk: 1 O'E from NW corner of Bid
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Mix Identification
330J15D4
ecified Stren
3000
Date Tested
06-13-07
07-04-07
07-04-07
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
69660
Air
Entrainment
3.3
Ticket
Number
59008247
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MUlnc
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
.,,~-
'DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214J 3505600 . FAX [214J 3500019