Loading...
Vista Point 2R-LR070515 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 122 REG PROJECT NO. 13581 SAMPLE DATE: 05-15-07 TECHNICIAN: L. Barnard PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Sidewalk: 388'W from SW a roach Desi n Information Source of Concrete Redi-Mix Mix Identification 23511504 ecified Stren 3000 Date Tested 05-22-07 06-12-07 06-12-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 103820 140400 137420 4920 Air Entrainment 4.7 Ticket Number 59007392 Extranet Distribution: (1) Jackson Shaw Company! Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell!Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT MLllnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REED EnGinEERinG GEOTECHNICAL AND G R CJ U F" ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 122 REG PROJECT NO. 13581 SAMPLE DATE: 05-15-07 TECHNICIAN: L. Barnard PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Sidewalk: 388'W from SWa roach Oesi n Information Source of Concrete Redi-Mix Mix Identification 23511504 Date Tested 05-22-07 06-12-07 06-12-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 103820 Air Entrainment 4.7 Ticket Number 59007392 Extranet Distribution: (1) Jackson Shaw Companyl Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214J 3500019