Loading...
Vista Point 2R-LR070512 REED EnGinEERinG GEOTECHNICAL AND G R 0 LJ P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 121 REG PROJECT NO. 13581 SAMPLE DATE: 05-12-07 TECHNICIAN: M. Wood PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Sidewalk: 120'S, 5'E from NE corner of Bid Desi n Information Source of Concrete Redi-Mix Mix Identification 23011501 Date Tested 05-19-07 06-09-07 06-09-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 75190 94400 96840 3390 Air Entrainment NA Ticket Number 13687078 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214J 3505600 . FAX [214J 3500019 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 120 REPORT DATE: 05-23-07 REG PROJECT NO. 13581 DATE OBSERVED: 05-12-07 TECHNICIAN: M. Wood PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Building 5 sidewalk: 200'S, 5'E and 5'N, 200'W from N.E. building corner. I Reference Plans or Notes Used: I Sheet C-8.1 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REED EnGinEERinG GEOTECHNICAL AND G R Cl L.J P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 121 REG PROJECT NO. 13581 SAMPLE DATE: 05-12-07 TECHNICIAN: M. Wood PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Sidewalk: 120'S, 5'E from NE corner of Bid Mix Identification 23011501 ecified Stren th 3000 Date Tested 05-19-07 06-09-07 06-09-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 75190 Air Entrainment NA Ticket Number 13687078 Extranet Distribution: (1) Jackson Shaw Companyl Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT MLllnc 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEl [214J 3505600 . FAX [214] 3500019