Vista Point 2R-LR070512
REED EnGinEERinG
GEOTECHNICAL AND G R 0 LJ P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 121
REG PROJECT NO. 13581
SAMPLE DATE: 05-12-07
TECHNICIAN: M. Wood
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Location of Sam Ie
Set Number Location
1 Sidewalk: 120'S, 5'E from NE corner of Bid
Desi n Information
Source of Concrete
Redi-Mix
Mix Identification
23011501
Date Tested
05-19-07
06-09-07
06-09-07
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
75190
94400
96840
3390
Air
Entrainment
NA
Ticket
Number
13687078
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214J 3505600 . FAX [214J 3500019
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U P
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 120
REPORT DATE: 05-23-07
REG PROJECT NO. 13581
DATE OBSERVED: 05-12-07
TECHNICIAN: M. Wood
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
I Items Observed:
I Building 5 sidewalk: 200'S, 5'E and 5'N, 200'W from
N.E. building corner.
I Reference Plans or Notes Used: I Sheet C-8.1
x IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Ronald F. Reed, P.E.
BW/rs
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019
REED EnGinEERinG
GEOTECHNICAL AND G R Cl L.J P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 121
REG PROJECT NO. 13581
SAMPLE DATE: 05-12-07
TECHNICIAN: M. Wood
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Location of Sam Ie
Set Number Location
1 Sidewalk: 120'S, 5'E from NE corner of Bid
Mix Identification
23011501
ecified Stren th
3000
Date Tested
05-19-07
06-09-07
06-09-07
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
75190
Air
Entrainment
NA
Ticket
Number
13687078
Extranet
Distribution: (1) Jackson Shaw Companyl
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
MLllnc