Loading...
Vista Point 2R-LR070423 (2) REED EnGinEERinG GEOTECHNICAL AND G R CJ U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 2 3 Ie Location Paving: 100'N, 70'E from SE bldg. corner Paving: 50'S, 45'E from NE bldg. corner Pavin : 190'5, 40'E from NE bid. corner Desi n Information Source of Concrete Mix Identification Redi-Mix 23601504 Age@ Total Load Date Tested Test Ibs. 04-30-07 7 101230 05-21-07 28 138500 05-21-07 28 135580 Hold H 2 3111 04-30-07 7 107810 3111 05-21-07 28 159450 3111 05-21-07 28 152830 3111 Hold H 3 3112 04-30-07 7 104840 3112 05-21-07 28 148760 3112 05-21-07 28 135850 3112 Hold H REPORT NO. 115 REG PROJECT NO. 13581 SAMPLE DATE: 04-23-07 TECHNICIAN: J. Ruiz PAGE: 1 of 2 ecified Stren 3600 4850 3820 5640 5410 5530 3710 5260 4810 5040 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . fAX [214] 3500019