Vista Point 2R-LR070423 (2)
REED EnGinEERinG
GEOTECHNICAL AND G R CJ U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
CONTRACTOR: Bullard Construction, Inc.
Location of Sam
Set Number
1
2
3
Ie
Location
Paving: 100'N, 70'E from SE bldg. corner
Paving: 50'S, 45'E from NE bldg. corner
Pavin : 190'5, 40'E from NE bid. corner
Desi n Information
Source of Concrete Mix Identification
Redi-Mix 23601504
Age@ Total Load
Date Tested Test Ibs.
04-30-07 7 101230
05-21-07 28 138500
05-21-07 28 135580
Hold H
2 3111 04-30-07 7 107810
3111 05-21-07 28 159450
3111 05-21-07 28 152830
3111 Hold H
3 3112 04-30-07 7 104840
3112 05-21-07 28 148760
3112 05-21-07 28 135850
3112 Hold H
REPORT NO. 115
REG PROJECT NO. 13581
SAMPLE DATE: 04-23-07
TECHNICIAN: J. Ruiz
PAGE: 1 of 2
ecified Stren
3600
4850
3820
5640
5410
5530
3710
5260
4810
5040
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . fAX [214] 3500019