Loading...
Vista Point 2R-LR070416 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 2 3 Ie Location Paving: 8'S, 23'W from NW corner of Bldg. 6 Paving: 103'S, 19'W from NW corner of Bldg. 6 Pavin : 207'8, 49'W from NW corner of Bid . 6 Desi n Information Source of Concrete Mix Identification Redi-Mix 23601504 Age@ Total Load Date Tested Test Ibs. 04-23-07 7 79960 05-13-07 28 112170 05-13-07 28 115270 Hold H 2 2879 04-23-07 7 90270 2879 05-13-07 28 127500 2879 05-13-07 28 134340 2879 Hold H 3 2880 04-23-07 7 84070 2880 05-13-07 28 125930 2880 05-13-07 28 121230 2880 Hold H REPORT NO. 114 REG PROJECT NO. 13581 SAMPLE DATE: 04-16-07 TECHNICIAN: D. Decuir PAGE: 1 of 2 ecified Stren 3600 4030 3190 4510 4750 4630 2980 4460 4290 4380 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019