Vista Point 2R-LR070416
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
CONTRACTOR: Bullard Construction, Inc.
Location of Sam
Set Number
1
2
3
Ie
Location
Paving: 8'S, 23'W from NW corner of Bldg. 6
Paving: 103'S, 19'W from NW corner of Bldg. 6
Pavin : 207'8, 49'W from NW corner of Bid . 6
Desi n Information
Source of Concrete Mix Identification
Redi-Mix 23601504
Age@ Total Load
Date Tested Test Ibs.
04-23-07 7 79960
05-13-07 28 112170
05-13-07 28 115270
Hold H
2 2879 04-23-07 7 90270
2879 05-13-07 28 127500
2879 05-13-07 28 134340
2879 Hold H
3 2880 04-23-07 7 84070
2880 05-13-07 28 125930
2880 05-13-07 28 121230
2880 Hold H
REPORT NO. 114
REG PROJECT NO. 13581
SAMPLE DATE: 04-16-07
TECHNICIAN: D. Decuir
PAGE: 1 of 2
ecified Stren
3600
4030
3190
4510
4750
4630
2980
4460
4290
4380
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019