Loading...
DR9002-CS 890106C0PPELL PUBLIC WORKS MEMORANDUM January 6, 1989 TO: FROM: RE: Alan Ratliff, City Manager Steve Goram, Director of Public Works 141 Hill Gary Hamrick Staff has researched the files in Public Works and were unable to find any letter received from Mr. Hamrick documenting flooding complaints at the above referenced location prior to the recent flooding. St~aff did locate phone messages which were responded to back in 1986 which resulted in inspection of the storm sewer inlet near the address and concrete grinding in the alleyway to' alleviate the ponding in the alley. Mr. Hamrick called on July 13, 1988 to report the problem of the alley not draining and water standing in driveway and flooding his garage as a result of the heavy rains received July 12, 1988. City forces did respond and inspected the storm drainage in the area and found. no obstruction. SGG/sm cc: Russell Doyle, City Engineer Per Birdsall, Street Foreman