Loading...
MacArthur Vista-LR070612 REECl EnGinEERinG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION MacArthur Vista Center 670 N. MacArthur Boulevard Coppel!, Texas REPORTED TO: MacArthur Vista, LP 12201 Merit Drive, Suite 170 Dallas, Texas 75251 ATTN: Mr. Alen Hinckley REPORT NO. 33 REPORT DATE: 06-12-07 REG PROJECT NO. 14082 DATE OBSERVED: 05-22-07 TECHNICIAN: R. Weathersby PAGE: 1 of 1 CONTRACTOR: Royal General Contractors, Inc. I Items Observed: I Sidewalk: 90'N-298'S, 68-89'W from west Vista Center Building. I Reference Plans or Notes Used: I Sheet 4 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) MacArthur Vista, LPI Mr. Alen Hinckley (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Rick O'Dell (1) Daniels & Associatesl Mr. Brent Lovelady (1) Royal General Contractorsl Mr. Bob Fowles (1) Royal General Contractorsl Mr. Micah Corn (1) UBSE/Mr. Gary Ten Eyck Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019